Laserfiche WebLink
• County Road H & Northbound 1-35W Ramps <br />• County Road H & Southbound 1-35 W Ramps <br />• County Road H & Mounds View Boulevard <br />• CSAH 96 & Southbound US Highway 10 Ramp <br />• CSAH 96 & Church Access/Future Site Access <br />3.3 EXISTING TRAFFIC VOLUMES <br />Average Annual Daily Traffic (AADT) volumes were obtained from the Minnesota Department of <br />Transportation's (MnDOT's) Transportation Data and Analysis Traffic Volume Maps. Daily volumes for <br />existing roadways within the study area are summarized in Table 3. It should be noted that these volumes <br />vary in year from 2011 to 2022. <br />TABLE 3: EXISTING AADT VOLUMES <br />ROADWAY <br />FROM <br />TO <br />AADT VOLUME <br />(Year of Data) <br />I-35W <br />CSAH 3 <br />CSAH 9 <br />131,800 (2022) <br />CSAH 96 <br />US Highway 10 <br />83,700 (2022) <br />US Highway 10 <br />1-694 <br />CSAH 96 <br />55,000 (2022) <br />CSAH 96 <br />1-35W <br />60,200 (2022) <br />CSAH 96 <br />1-35 <br />US Highway 10 <br />11,200 (2021) <br />US Highway 10 <br />CSAH 50 <br />17,300 (2021) <br />CSAH 103/CSAH 103 <br />East of CSAH 103/CSAH 103 <br />8,200 (2019) <br />Mounds View <br />Boulevard <br />County Road H <br />County Road H2 <br />19,900 (2020) <br />County Road H <br />South of County Road H <br />23,100 (2014) <br />County Road H <br />Old US Highway 8 <br />Mounds View Boulevard <br />9,500 (2020) <br />Mounds View Boulevard <br />1-35W Southbound Ramp <br />5,600 (2011) <br />Kimley-Horn collected turning movement counts (TMCs) at the following study intersections on Thursday, <br />March 7, 2024: <br />• County Road H & Mounds View Boulevard (AM and PM Peak Hour Counts) <br />• CSAH 96 & Southbound US Highway 10 Ramp (AM and PM Peak Hour Counts) <br />• CSAH 96 & Church Access/Future Site Access (through volumes collected from count at CSAH 96 <br />& Snelling Avenue) <br />Note that at the church access, traffic volumes were determined from a count at the nearby CSAH 96 & <br />Snelling Avenue (since there are no access points between these two intersections) and the turning <br />volumes were taken from Ramsey County's 2024 Rice Creek Commons Traffic Study. These counts were <br />conducted on Tuesday, October 24, 2023. Note that this count was collected for the purposes of traffic <br />signal warrant analysis to be completed at the intersection and the existing turning volumes to and from <br />the Northern Heights Access are anticipated to be insignificant compared to the site generated traffic. <br />Turning movement counts at the two roundabout intersections were collected on Tuesday, March 12, <br />2024. <br />TCAAP AUAR Update I Traffic Analysis <br />April 2024 <br />