My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-24-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
04-22-24-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 10:28:54 AM
Creation date
4/19/2024 10:25:55 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 5% to/from the south on US Highway 10 <br />Proposed site traffic was assigned to the surrounding roadway network and study intersections by <br />applying the trip distribution provided in Exhibit 6 to the trip generation forecast for the development <br />scenario as provided in Tables 6, 7, and 8 for each respective scenario. Exhibit 7 provides the project trip <br />assignment for the Minimum Density Build (2040) scenario. Exhibit 8 provides the project trip assignment <br />for the Maximum Density Build (2040) scenario. Exhibit 9 provides the project trip assignment for the <br />Maximum Density Build with Discount Retail (2040) scenario. <br />4.5 TOTAL TRAFFIC <br />The future year (2040) build traffic volumes were calculated by adding the Year 2040 No -Build traffic <br />volumes (Exhibit 5) to the site trips for the Zoning, Maximum Density, and Maximum Density with <br />Discount Retail scenarios, which are shown in Exhibits 8, 9, and 9, respectively. The resultant build (2040) <br />traffic volumes for the Zoning, Maximum Density, and Maximum Density with Discount Retail scenarios <br />are shown in Exhibits 10, 11, and 12, respectively. <br />TCAAP AUAR Update I Traffic Analysis <br />April 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.