My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-11-1993
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1993
>
CCP 01-11-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:20 PM
Creation date
11/6/2006 2:49:52 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . .. <br /> . rI'/,I~ -:,I- CONSULTING ENGINEERS <br /> Maier Stewart & Associates Inc. <br /> January 5, 1993 <br /> File No: 520-028-30 <br /> Ms. Dorothy Person <br /> City Administrator <br /> City of Arden Hills <br /> 1450 West Highway 96 <br /> Arden Hills, MN 55112 <br /> RE: CLMM DEVELOPMENT <br /> . Dear Ms. Person: <br /> During Fall 1992, a private development to install sanitary sewer and water main was <br /> requested by four property owners south of County Road E along Lake Johanna. The work <br /> consisted of installation of 430 linear feet of 6" water main and 400 linear feet of 8" sanitary <br /> sewer. These utilities were extended from existing City facilities. The Contractor for the <br /> project was Gary Contracting Co., rnc.. <br /> As directed by the City, we have inspected the installation of these utilities and found the <br /> work to be in compliance with the approved plans and specifications. We have also worked <br /> with Public Works Supervisor Dan Winkel to ensure compliance with all City requirements. <br /> All necessary tests have been completed on the improvements with positive results. <br /> As outlined by the contract specifications, a one-year guarantee is required from the <br /> Contractor for the utility improvements. This warranty period begins at the date of final <br /> acceptance by the City Council. <br /> We therefore recommend that the City Council accept these improvements contingent upon <br /> receipt of the performance bond. We have spoken with the Contractor and Developer for <br /> this project and the bond will be provided directly to you. <br /> . <br /> 1959 SLOAN PLACE, SUITE 200, ST, PAUL, MINNESOTA 55117 612-774-6021 <br /> 9600 SHELARD PARKWAY. SUITE 102, MINNEAPOLIS, MINNESOTA 55441 612.546.Q432 . Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.