My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-20-1993
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1993
>
CCP 01-20-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:21 PM
Creation date
11/6/2006 2:49:57 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. Honorable Mayor and City Council <br /> January 14, 1993 <br /> Page Two <br /> Information provided by MnDOT shows that between January 1986 and December 1991 when <br /> the median was open, 28 accidents occurred at the intersection. Eleven of the accidents <br /> involved vehicles using the median opening. All accidents caused personal injuries, including <br /> three fatalities. In a letter dated November 26, 1991, to the City of Arden Hills, MnDOT <br /> indicated that, after a review of all data, the median closure was warranted. <br /> INTERSECTION IMPROVEMENTS - ALTERNATIVE 1 <br /> The proposed TH 51 and Snelling Avenue intersection realignment is shown on Exhibit 1. <br /> This alternative turns the Hamline Avenue/Old Snelling Avenue/TH 51 area into one <br /> intersection with the streets at right angles. The intersection would also be signalized. <br /> The estimated construction and project costs are shown in Table 1. The total project cost is <br /> estimated at $428,007.50. The estimated overhead items have been calculated at 32 % of the <br /> construction cost, as outlined in the City's Assessment Manual. <br />. It appears that existing right-of-way is sufficient to construct the intersection improvements. <br /> Therefore, no additional land acquisition costs, which would be loo% City funded, would be <br /> incurred with this alternative. <br /> Old Snelling Avenue is currently a Ramsey County roadway. The County is planning to turn <br /> back Old Snelling Avenue to the City of Arden Hills. The intersection alternative would <br /> require coordination of the turnback with the County. <br /> Mounds View School District offices are located at Hamline and Lydia Avenue. Mr. John <br /> Ostlund, the District's Assistant Director of Support Services, was contacted regarding their <br /> position relative to the median closure. He stated that the schools had stopped routing buses <br /> through the TH 5110ld Snelling Avenue intersection for safety reasons three years prior to the <br /> median closure. Mr. Ostlund indicated that if the intersection were sig,,~li7P1l, the School <br /> District would utilize it for bus routes. <br /> As shown on Exhibit 1, there is a wetland to the south of Old Snelling Avenue. The wetland <br /> appears on the US. Fish and Wildlife National Wetland Inventory Map. Construction affecting <br /> a wetland area requires permitting from both the Corps of Engineers and Rice Creek Watershed <br /> District (RCWD). Wetland mitigation is required by RCWD at a minimum ratio of 1:1 to a <br /> maximum of 2: 1. Construction of the proposed intersection may affect a portion of the <br /> wetland. In this case, the area north of the proposed intersection would be proposed as an area <br /> for mitigation. <br />. It is our understanding that funding for the proposed intersection alternative would be 50% <br /> State costs, 25 % County costs, and 25 % City costs. The State costs would include normal <br /> roadway improvements on TH 51 at the intersection and one-half of the signal costs. Mr. <br /> O'Keefe indicated that additional MnDOT funding may be available if the median openings at <br /> 03Cl-1506.dcc <br />
The URL can be used to link to this page
Your browser does not support the video tag.