Laserfiche WebLink
<br /> -------- <br />. TABLE 1 <br /> ESTIAIA TED COSTS - AL TERNA TIVE 1 <br /> T.H. 51/SNEWNG AVE. INTERSECTION IMPROVEMENTS <br /> CITY OF ARDEN HILLS <br /> PROJECT NO. 520-030-70 <br /> ITEM UNIT <br /> NO. ITEM UNIT QUANTITY PRICE TOTAL <br /> 1 REMOVE BIT. SURFACE SY 6000 1.25 $7,500.00 <br /> 2 REMOVE PIPE LF 370 5.00 $1,850.00 <br /> 3 REMOVE CONCRETE MEDIAN SY 325 7.50 $2,437.50 <br /> 4 TRAFFIC CONTROL LS 1 SOOOO.OO $50,000.00 <br /> 5 COMMON EXCAVATION CY 2000 8.00 $16,000.00 <br /> 6 SUBGRADE EXCAVATION CY 2100 5.00 $10,500.00 <br /> 7 SELECT GRANULAR BORROW CY 2100 7.00 $14.700.00 <br /> 8 SUB GRADE PREPARATION STA 15 100.00 $1,500.00 <br /> 9 CLASS 5 AGGREGATE BASE TON 2015 6.50 $13,097.50 <br /> 10 TYPE 31 BASE COURSE TON 1050 22.00 $23,100.00 <br /> 11 TYPE 41 WEAR COURSE TON 1050 25.00 $26,250.00 <br /> 12 TACK COAT GAL 450 1.25 $562.50 <br /> 13 CONCRETE CURB & GUITER LF 1000 6.00 $6,000.00 <br /> 14 CONCRETE MEDIAN SF 100 30.00 $3,000.00 <br /> 15 SIGNAL SYSTEM LS 1 100000.00 $100,000.00 <br /> 16 STORM SEWER SYSTEM LS 1 40000.00 $40,000.00 <br /> 17 SODDING SY 3S00 2.00 $7,000.00 <br /> 18 SEEDING AC 0.5 1500.00 $750.00 <br /> ESTIMATED CONSTRUCTION COST $324,247.50 <br /> OVERHEAD (32%) - includes administralion, mgincering. fiscal & $103.760.00 <br /> legal costs per Arden Hills assessment manual. <br /> ESTIMATED TOTAL PROJECT COST ' '"" tf'l 0: ~ 1'>:::: , <br /> -<-~...../.."~ ,~ <br />. <br />