Laserfiche WebLink
<br />. <br />.. Page 3 <br /> City of Arden Hills, Minnesota <br />II AEC Project No. MN 1410 <br />. It is estimated that the complete recoating plus the <br /> recommended modifications and repairs will cost <br />. approximately $253,000.00 and take 7 weeks to complete. <br /> This cost estimate includes the cost for exterior <br />* containment and provisions to eliminate generating hazardous <br /> waste. <br />I These cost estimates represent the current pricing <br /> structure. If you plan to proceed with the reconditioning <br />I of this tank, in order to obtain more competitive bids, the <br /> project should be bid at least nine months prior to the <br />. start date. <br />.. The tank painting should be first inspected within the <br /> warranty period, and every three years thereafter. <br />I <br /> In our opinion, if all the recommendations are followed and <br />, the tank is inspected regularly, the new coating should last <br /> 15 to 20 years with only minor repairs. With proper <br />, maintenance, the tank will provide many years of service. <br />I 2.0 RECOMMENDATIONS <br />, The photographs referred to in this section are in <br /> Appendix A. All drawings are found in Appendix B. The <br />I surface preparation requirements for all repairs or neT" <br /> welding are described in Appendix C. The exterior and <br />I interior paint chip lead test results are in Appendix D. I <br />,- i <br />I I <br /> I <br /> - <br />