My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-08-1993
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1993
>
CCP 02-08-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:22 PM
Creation date
11/6/2006 2:50:00 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FEB- ;::-93 WED 8:33 MAIER STE~~ART & AS::=:OC _ P..0l5. <br />, V V <br />. CIiY OF ARDEN HILLS <br /> JANUARY 15, 1990 <br /> PAGE SIX <br /> various lakes makes getting around a little tough. To a contractor, <br /> "getting around" or mobilization costs, can become a rather large portion of <br /> small jobs sLier. liS see.l coating projects. We therefore would advi~e the <br /> City to group type~ of rlork wherever ~ossib1e, to minimize the amount of <br /> mOVing a contractor has to do. for example, if a group of streets in a <br /> particular neighborhood or area all have ratings of 90 or above, it would be <br /> economically wise to seal coat them all within the same street project. Bid <br /> prices should reflect the fact that all equipment necessary to complete the <br />. work will be close at hand and operating the entire time it's on the job. A <br /> contractor therefore doesn't have to recover his costs associated with <br /> having equipment sitting on one job when it could be operating elsewhere. <br /> To a somewhat lesser degree, this same method of grouping similar types of <br /> work relates to overlaying streets. Materials are brought into a certain <br /> area and immediately used. <br /> 8y USing the ratings for each of the streets within the City as well as <br /> our beSt engineering judgement regarding grouping similar improvements, we <br /> have drafted a two (2) year street seal coating and overlay improvements <br /> program. The program is based on an annual City budget of $100,000. The <br /> fc11cw1ng tab'lCS ,I',.;;\> the proposed seal coating alid overlay progr'"ms for' <br /> both 1990 and 1991. <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.