Laserfiche WebLink
<br /> . <br /> - <br /> - . <br /> Memo; Femwood Avenue Water Tower .;. <br />- March ll, 1993 <br /> Page Two <br /> We also recommend that l!1e entire interior coatj,lg including the wet area under the normal <br /> water line be completely redone at this time. (Spot repairs are necessary a~~ording to the <br /> ABC report.) Removal of all interior )i,>.ad based paint would thel] be accomplished. <br /> There are two additional factors to c.onsider whcn deciding Oil lhe proj/X'I !;Chedulc: <br /> 1. The MPCA is in l!1e process of draftil1g nltes for removal and dispowl of lead based <br /> paint. AllIlliugh major changes in the rules are not anticipated. allY r~quired changes <br /> in procedure or disposal requirements could increase the costs of the project. <br /> 2. Current specifications include NJcs which prevent sandblasting in high wind <br /> . . <br /> conditions. This restriction can. create sched\IJe problems for contrdctors. If both <br /> inside and outside work arc included in the s;une year, the cOntractor can col1tinu~ <br /> work inside the Uink on windy days and remain within, the project scl1e<1ule, (We <br /> anticipat.e this would alw be reflected as a reduction in the total project COSt.) <br />- <br />- 5201{t?'.H.Ij,H ~ <br /> '- <br /> - <br />f <br />