My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-09-1993
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1993
>
CCP 08-09-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:32 PM
Creation date
11/6/2006 2:57:32 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . <br /> . <br /> . CONSULTING ENGINEERS <br /> Maier Stewart & Associates Inc. <br /> August 18, 1993 <br /> File No. 520-047.10 <br /> Mr. Dan Winkel <br /> City of Arden Hills <br /> 1450 West Highway 96 <br /> Arden Hills, Minnesota 55112 <br /> RE: 1994 STREET IMPROVEMENT RECOMMENDATIONS <br /> Dear Mr. Winkel: <br /> Please find enclosed the American Engineering & Testing, Inc. (AET) geotechnical report <br /> regarding the referenced project. As noted in our previous discussions, the report addresses the <br /> possible and recommended means of restoring or reconstructing several streets within Arden <br /> . Hills. According to the report, (enclosed) Kiethson Drive appears to have an acceptable base <br /> to support cold in-place recycling as a viable means of restoration. The recommended means <br /> of restoring Bussard Court, Amble Drive and Dunlap Avenue, is reconstruction. Based upon <br /> the subsurface conditions along these streets, overlaying or recycling with an overlay would only <br /> provide a temporary fix to an on-going problem. In order to properly facilitate repairs to these <br /> streets, the streets should be removed and subcut to a depth of approximately one-foot below the <br /> existing base. Select granular borrow should then be placed to provide adequate drainage from <br /> the subsurface. This would prevent the excessive frost and drainage problems which currently <br /> exist in those streets. <br /> Based upon these recommendations, the costs for the various recommended repairs! <br /> reconstruction are as follows: <br /> Street ReDair Cost <br /> Bussard Court Reconstruct $72,300 <br /> Dunlap Avenue Reconstruct $110,000 <br /> Amble Drive Reconstruct $186,100 <br /> . Kiethson Drive In-place Recycle $22,800 <br /> 1959 SLOAN PLACE. SUITE 200, ST. PAUL, MINNESOTA 55117 612-774';;021 <br /> 9800 SHELARD PARKWAY. SUITE 102, MINNEAPOLIS. MINNESOTA 55441 612.546-0432 . Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.