My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-12-1993
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1993
>
CCP 10-12-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:34 PM
Creation date
11/6/2006 3:05:09 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> " <br /> . CITY OF 1\RDEN HILLS <br /> ME2DWIDUM <br /> 'IO: Dorothy Person, City 1\dm:inistrator <br /> FRCM: Dan Winkel, Public Works SUperintendent /)AW, <br /> Dl'd'E : OctOber 15, 1993 <br /> SUBnX:T: 1994 Pavement Management Re<::onmendations <br /> In August of this year, a geoteclmical study was done by American Engineering <br /> and Testing to determine the road =nditions for planned reconstruction for <br /> 1994. <br /> The study results are enclosed. Also enclosed is a letter from Greg <br /> stonehouse from Maier stewart with the estimated costs for the reconstruction <br /> of Bussard Court, Dunlap Avenue, and Amble Dr'ive. The =ld in-place recycle <br /> for Keithson Dr'ive will also be done in 1994. <br /> The =ent 1994 proposed J:::udget has $132,200 from the general fund, and <br /> . $55,000 from Minnesota state Aid mintenance monies and County aid. In <br /> addition, the stonn water management J:::udget has $25,000 for the pavement <br /> management improvements. These monies would be used for new =00 and catch <br /> basin repairs. <br /> Should the Council decide to assess 50% for the reconstruction projects, then <br /> all four of the streets listed in the geotechnical study can be completed. <br /> The City'S estimated share of =sts for these projects would be $207,000. <br /> After the bids are received on these projects, we will better ]mow how much is <br /> available for seal-coating and over-laying. I would like to see at least <br /> $20,000 to $25,000 in seal-coating work done in 1994. A=rding to the <br /> pavement rating schedule, the top five streets due for over-lay are Pleasant <br /> Dr'ive, Harriet Avenue, Lake Lane, Hunters Court and Benton Way. The city <br /> engineer and myself will estimate =sts for these streets. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.