Laserfiche WebLink
<br /> ---- <br />. <br /> CJ:TY OF ARDEN E!ILLS <br /> MEMJRANI:Dot <br /> DAT.E : DeceuCer 2J., 1.993 <br /> TO: I:orothy A. Person, City ~n'; "tzator <br /> ~: Brian Fritsin;er, ("",.,.".,.; ty p"mn';ng Ccord:iIlat:o@ <br /> StlBJECT : Revised Mechanical Fees Schedule <br /> D..1ring our recent discussions with our inspection depart:rre.'lt, the issues <br /> of fees were reviewed. I l>.<Juld like to propose one change in the area <br /> of rrechani.cal fees. <br /> CUrrently our fee schedule for =nercial projects is line specific f= <br /> the tjp: and size of project. This is also true f= residential <br />. projects. Many carmmi.ties in this area of the netro area charge a l:ase <br /> fee plus a perce.'ltage of the valuation. <br /> By changing to a valuation, it eliminates SClle of the ability of a <br /> =tractor to tl:y and fudge the rragnitude of the project to reduce their <br /> expense . By going to a valuation, it places the responsibility on the <br /> =tractor to provide an actual project bid. <br /> Our insp:ctors have indicated that this should not result in a loss of <br /> fees to the city. In rrost cases, it should balance out or increase <br /> slightly. <br /> I I>.<JUld reccmre.'ld that the O:::mre...""Cial Mechanical fees l:e changed to the <br /> following: <br /> Fee is $50.00 plus one and one-quarter pe..""Cent (1;(0-) of the <br /> total valuation of installation, including lal::or and <br /> material, and cost of equiprent (Value of I>.<JIX =t include <br /> the cost of installations, alterations, additions = <br /> repairs, including all lal::or and material supplied by the <br /> contractor. In addition, it shall include all materials <br /> supplied by other sources when these materials are nonrally <br /> supplied by the contractor) . <br /> - <br />. <br /> j <br /> -..- <br />