My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-31-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 01-31-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:40 PM
Creation date
11/6/2006 3:13:24 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I AET #93-1379 - Page 10 <br />f <br /> . Overlay - Although this approach may have the lowest initial cost, this approach may not <br />I be appropriate on any of the streets over the long term. Existing streets would continue <br /> to have frost/drainage problems, and reflection cracking would appear within the new <br />I pavement. This approach would include continued higher maintenance cost, and would <br />I not perform as well. The approach could be considered on Keithson Drive; although <br /> with the sags in the road, thicker bituminous overlay materials would be needed to <br /> - provide a more level surface in sag areas. <br />I <br /> . Cold In-place Recycling - This approach may have limited results in the Bussard, Amble, <br />I <br /> and Dunlap Street areas, as again frost/drainage problems would be expected to continue. <br />I However, this approach may be appropriate for Keithson Drive since the subgrade <br /> already includes a granular borrow layer. <br />.. . Roadway Reconstruction - If the budget allows, we recommend you consider <br />I reconstructing Amble Drive, Bussard Court and Dunlap Street so that the subgrade <br /> frost/drainage characteristics can be improved. The subgrade preparation should include <br />I placing a sand drainage layer. Because portions of the subgrade are reasonably stable, <br /> it should be possible to significantly improve subgrade performance with only a l' <br />I minimum thickness layer. Where subgrade strength is poor, we recommend increasing <br /> this to 2', as subcuts to improve strength in the lower portion of the 3' subgrade zone <br />I will already be needed; and improving the currently wet subgrade soils can be difficult, <br /> particularly when underlying soils are of poor quality. <br />I <br /> RECOMMENDATIONS <br />I <br /> Sube:rade Preparation/Reconstruction Areas <br />I We recommend streets being reconstructed undergo sub grade preparation with a select granular <br />{' layer at the top of subgrade. We recommend this layer be a minimum of l' thick. Therefore, <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.