Laserfiche WebLink
<br /> . <br /> . <br /> . To help reduce costs of the RadioR.ead or PhonRead Systems cost sharing <br /> of equiprent with other tmmi.cipalities may be a good option. <br /> These costs do not include installation costs. New Brighton has <br /> recently installed apprcximately 2,400 rreters by using an independent <br /> contractor at a rate of $39.00 per rreter. The additional cost to <br /> install 2,400 rreters in Arden Hills ;,aUd equal $93,600. if an <br /> independent contractor was used. <br /> The Council may want to explore various ways to finance this major <br /> project. Solre options may include assessiIlg the property owners, sare <br /> type of bond, City pays in full, or other options as outlined by the <br /> Council and/or the Finance Comnittee. Some major manufacturers are <br /> also offering ~cipal lease prcgrams. <br /> I reccrnrend that the TouchRead System or it's equivalent be installed <br /> in Arden Hills as the basic starting system. While actual meter costs <br /> are the same for all options, the additional hardware and software <br /> costs are expected to decrease over the next five years for the <br /> RadioRead and PhonRead Systems. At the current time I am thinking <br /> . that a combination of at least tw:l of the systems IIQU1d I'.Ork best for <br /> Arden Hills. For exarrple: current rreter routes that have h::mes very <br /> close to one another could be read with a TouchRead gun and walking. <br /> Other routes that are rrore spread out and not as easily accessible <br /> could be read by RadioRead or PhcneRead if necessary. The canbination <br /> of technologies ;,aUd require equiprent sharing with other cam1UIlities <br /> to make it economical. Perhaps New Brighton IIQU1d one day convert to <br /> all RadioRead or PhonRead and make the conversion for Arden Hills much <br /> rrore econcmical. <br /> I have talked to a number of manufacturer representatives who I'oOUld <br /> like to do a short dem:mstration for Council at a l'.O:tksession setting. <br /> I would like to schedule these derronstrations at the Council's <br /> earliest convenience, so that the process of meter replacerrent can <br /> troVe ahead as Council so desires. <br /> . <br />