My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-13-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 06-13-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:51 PM
Creation date
11/6/2006 3:20:58 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> - <br /> . MS ~ <br /> June 21, 1994 <br /> CMSULTINGESGLm:RS File No: 109-001-30 <br /> Mr. Donald S. Bluhm <br /> Metropolitan Waste <br /> Control Commission <br /> Mears Park Centre <br /> 230 East Fifth Street <br /> CIVIL ENGINEE~ING: St. Paul, MN 55lO1 <br /> RE: TWIN CITIES ARMY AMMUNITION PLANT <br /> ENVIRONMENTAl (TCAAP) INTERCEPTOR <br /> MUNiCiPAL Dear Don: <br /> illANNING Construction of the TCAAP Interceptor is now underway. Bonine Excavating of Elk River <br /> is the contractor. The new interceptor should be in service on or about September 1, 1994. <br /> SHUCTURA( After the interceptor sewer is constructed, the U.S. Army intends to convey the interceptor <br /> , sewer to the City of Arden Hills who, in turn, will ask the MWCC to acquire the interceptor <br /> SUIIH1NG sewer as a Metropolitan Facility. <br /> ;~MF!C Per our earlier meetings and telephone conversations, the interceptor sewer can be acquired <br /> by the MWCC if it is large enough to meet the 50 year needs of its service area. <br /> ;l~NS?O~rJnc~.; <br /> During a past telephone conversation, you indicated that the following charges to the original <br /> design were necessary to make the interceptor sewer "acquirable": <br /> . Construct an additional manhole on the interceptor sewer at the east right-of-way line <br /> of Interstate 35W. This additional manhole was to be added to make maintenance <br /> easier. <br /> . Increase the pipe diameter of the pipe from the east right-of-way line of Interstate <br /> 35W to the Mounds View receiving manhole (northeast comer of the U.S. Highway <br /> 1326 Energy Perl< Drive lO/Ramsey County Road H intersection) from 18"0 to 24"0. The pipe size was to <br /> Sf, Paul, MN 55108 be increased to provide for the 50-year needs of the interceptor sewer's service area. <br /> 612-6AH389 These changes were incorporated into the original design by addendum. The bid price for <br /> Fox: 612-644-9446 these changes was $20,600,00. At their Council meeting of Apri125, 1994, the Arden Hills <br /> City Council voted unanimously to fund the over-sizing and the additional manhole. On <br /> . 9800 Sholord Portv.ay April 26, 1994, the City of Arden Hills remitted a check to Federal Cartridge Company for <br /> the over-sizing. <br /> MiM""poIi., MN 55441 <br /> 612-546.0432 <br /> Fox: 612-5.44-6398 <br />
The URL can be used to link to this page
Your browser does not support the video tag.