My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-27-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 06-27-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:51 PM
Creation date
11/6/2006 3:21:01 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . BT'TH <br /> . E T <br /> L ~ , L <br /> . c: () L L E (; E &. <br /> S E \] [ :'\ A R Y <br /> June 10, 1994 <br /> Mr. Brian Fritsinger <br /> Community Planning Coordinator <br /> City of Arden Hills <br /> 1450 West Highway 96 <br /> Arden Hills, MN 55112-5794 <br /> Dear Brian: <br /> As we discussed this week we are requesting an extension for the <br /> use of our temporary building housing our continuing studies <br /> offices. The original intent was to use this building until the <br /> Community Life Center was completed and office space was made <br /> available. Due to budget constraints most of the office space in <br /> the Community Life Center was eliminated. Additionally our <br /> Continuing studies program has grown beyond our projections. <br /> Chalberg Missionary Residence was considered for renovation into an <br /> office complex but increased student enrollment has dictated it <br /> remain as a housing unit. <br /> We have commissioned an extensive Campus Master Plan by the firm of <br /> . Bentz, Thompson, and Reitow of Minneapolis. The results of this <br /> Master Plan will form the basis for future campus development and <br /> building programs. We anticipate short term and long term needs to <br /> be addressed with additional construction projects. In the mean <br /> time, we request an extension of the use of this one temporary <br /> building until October, 1998. <br /> with the above mentioned planning and subsequent construction, as <br /> well as a complete renovation of "Nelson/Kresge Mall" scheduled for <br /> 1998, we do not anticipate requesting additional use of this <br /> facility at this location. <br /> Thank you for your consideration and I wait direction from you as <br /> to any additional information you need to expedite this approval <br /> process. <br /> Sincerely, <br /> C~~ d~tLtQ <br /> craig A. Hjelle <br /> Director of Physical Plant <br /> . PIlY"IC\I. PLA.:\T Drp:\RT.\fE:\T <br /> 39()() BITJlEL DR(\E <br /> ST [J;\l I.. :\lI'\.'\ESOT.-\ ;~ 112 <br /> () I 2-(,.-<,;-.;-(}.20f) <br />
The URL can be used to link to this page
Your browser does not support the video tag.