Laserfiche WebLink
<br /> . . <br /> ~ Administrator Comments 2 July 7, 1994 <br /> information. <br /> 3, Review of the 1994 Pavement Managerrent Schedule - Dan has <br /> met with the contractors and will review the timing and <br /> schedules. See the enclosed letter sent to residents. The <br /> copy of the letter says, "Dear Resident", but all letters <br /> mailed were addressed to specific property addresses and <br /> individuals. <br /> 4. Tiller Lane and Hamline Avenue have both developed holes in <br /> the pavement this w=ek. The hole on Harnline Avenue is in <br /> the middle of the of the South bound traffic lane and south <br /> of Colleen Avenue. It app=ars that this hole developed <br /> above the storm sewer pip: as a result of the storm water <br /> pip: separating one inch 0 OUr crew is repairing the pip:, <br /> which was originally installed in 1986 during <br /> reconst:ruction, The hole on Tiller Lane is about three feet <br /> frem the gutter area of the West bound lane, halfway l:etween <br /> Harnline Avenue and Canon, The Tiller Lane problem will l:e <br /> repaired as = as possible 0 <br /> 5. You probably have noticed that the closed median at TH 51 <br /> . and Old Snelling has had apparent drive-throughs. <br /> O:mnissioner Wedell also info:med me that he has received <br /> t\\O calls voicing canplaints about the situation. The metal <br /> bars =-rently are pushed down close to the ground. City <br /> staff have contacted the ffi3.intenance and administrative <br /> staff at the State to request that repairs and irrprovements <br /> l:e done in the area. The Council may wish to discuss this <br /> situation and pass a rrotion to ask the State for <br /> inprovements of a rrore pennanent nature. <br /> c. Parks & Recreation: Public hearing for use of grant funds to <br /> renovate Perry Park - see Cindy Severtson's menD frem last w=ek. <br /> She will make a presentation for the public's information. A <br /> rrotion calling the hearing is needed for July 25, 1994 at 7:30tM <br /> at the New Brighton City Hall. <br /> do AcCOilllting: Please see the enclosed menDS regarding: <br /> 1. log of 1994 Y'ID Investrrent Activity <br /> 2. June 1994 Operating Results Ccmnentcuy <br /> IV. UPDA1ES : <br /> a, Parks & Recreation: <br /> 1. Trail signs are in the process of l:eing installed in the <br /> next few weeks. <br /> ~ 2. A retaining wall behind the Omnings Park dugout is l:eing <br /> installed. <br />