My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-21-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 07-21-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:53 PM
Creation date
11/6/2006 3:27:22 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. Planning Minutes Page 2 07/06/94 <br /> antenna must match the tower and tank, No screening of the <br /> antenna is being requested. NSP also needs a transmitting <br /> station which will be enclosed within Cellular One's <br /> transmitting station, NSP will need to come to an agreement <br /> with Cellular One as to the use of this transmitting system, <br /> Staff recommends approval of this SUP application, <br /> There were no comments from the Commission. <br /> Mike Mazatello, Cellular One representative, stated this is <br /> a network system used to monitor the power flow to <br /> customers. It relays information back to NSP with what is <br /> happening in the field and detects power outages faster and <br /> more efficiently. NSP requires twenty (20) radio sites <br /> throughout the Metro Area. <br /> Carlson asked what the antenna was used for, <br /> Mr. Mazatello explained the antenna is used to communicate <br />. with mechanical apparatus throughout the neighborhoods, It <br /> relays voltage information and supervises control, <br /> Mr. Carlson asked how big the monitoring system is <br /> physically, <br /> Mr. Mazatello stated 600 pounds, The dimensions are four <br /> (4) feet square sixteen (16) inches deep. Typically, the <br /> antennas are mounted to a pole or post. <br /> Mr. Carlson asked about the maintenance on the box, <br /> Mr. Mazatello stated once a year there will be maintenance <br /> tests run on the transmitting station, Cellular One will be <br /> contacted when these tests need to be run. <br /> vice Chair piotrowski questioned whether NSP will,pay rent <br /> to two (2) parties. <br /> Mazatello stated the details of the lease will be determined <br /> with the City of Arden Hills. <br />. Mr. Fritsinger stated the final details of this agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.