Laserfiche WebLink
<br /> " <br /> . Mr. Dan Winkel <br /> August 3, 1994 <br /> Page Two <br /> fiscal, and legal expenses. Of the $270,000 reconstruction cost, approximately $80,000 is <br /> attributable to storm sewer construction, The storm sewer construction would consist of the <br /> installation of catch basins at a low point near 3rd A venue and the installation of catch basins <br /> . and storm sewer east of New Brighton Road to Lake Johanna. In addition to these costs, a <br /> sanitary sewer replacement may be necessary as the existing sewer extends along an easement <br /> that lies on back lot lines. As this segment of sanitary sewer has proven to be a maintenance <br /> problem, its replacement has also been considered. That replacement is estimated at <br /> approximately $24,000, a cost that is not included in the $270,000 for street and storm sewer <br /> construction as outlined above. <br /> As the County has considered cold in-place recycling as an option for this roadway, it is <br /> possible that incremental cost could be obtained in the turn-back agreement. The estimated <br /> cost for recycling the roadway is approximately $54,000, This amount could be subtracted <br /> from the $270,000 project cost to yield a net cost of $216,000 for the reconstruction of <br /> Stowe Avenue. <br /> . This letter does not address any additional utility repairs outside of the 1,000 linear feet of <br /> sanitary sewer replacement. If the City of Arden Hills requires any additional maintenance <br /> or repairs, those should be addressed in the planning stages of the project. Soil borings <br /> should also be advanced to determine subgrade soil conditions in order to evaluate the need <br /> for subgrade correction and drainage. <br /> We hope this letter and cost estimate assist you in the planning process for Stowe Avenue. <br /> Please contact our office if you have questions or require additional information regarding <br /> this issue. <br /> Sincerely, <br /> MSA, CONSULTING ENGINEERS <br /> ~s~l!;f- <br /> GJS:tw <br /> cc: Ms. Dorothy Person, City Administrator <br /> . 000-0309 .aug <br />