My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-08-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 08-08-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:55 PM
Creation date
11/6/2006 3:27:30 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> , ,. <br /> . MS r- <br /> C1I~S[LmG &~G1~EERS <br /> August 3, 1994 <br /> File: 520-000-00 <br /> Mr. Dan Winkel <br /> City .of Arden Hills <br /> C'I!I ENGiNEf~ING 1450 West Highway 96 <br /> Arden Hills, MN 55112 <br /> EN'IIROMI/JENTAI RE: STOWE A VENUE <br /> ESTIMATED CONSTRUCTION COSTS <br /> ,"o1U."JICiPAl <br /> Dear Mr. Winkel: <br /> PLANNING <br /> This letter is submitted as requested by the City of Arden Hills in regards to the possible <br /> . S;WCTURA! reconstruction .of Stowe Avenue fr.om Cleveland Avenue t.o Lake J.ohanna Boulevard. The <br /> existing r.oadway is a Ramsey C.ounty r.oad that is being c.onsidered far "turn-back" t.o the <br /> 5i...T,:;YiNG Cities of Arden Hills and New Brighton. The east secti.on.of St.owe Avenue extends from <br /> New Brighton Road to Lake Johanna Boulevard. The secti.on of roadway is approximately <br /> ;t.1F,~I'C 1,350 feet in length and 33 feet in width. This segment of roadway lies entirely within the <br /> City of Arden Hills. The segment to the west extends from New Brighton Road to Cleveland <br /> ~_~,.l,',SPC~TA;,'CN A venue and is approximately 28 feet in width. This section of roadway is a common road <br /> between the Cities of Arden Hills and New Bright.on. <br /> The county has considered cold in-place recycling for the roadway in the past; however, the <br /> City of Arden Hills has requested that MSA evaluate the cost to reconstruct the roadway with <br /> curb and gutter t.o meet the City of Arden Hills' standards far a residential roadway, This <br /> letter addresses the costs associated with such improvements and also includes the cost .of <br /> storm sewer installation to remove storm runoff from the public right-of-way. The costs of <br /> such improvements have been split between street improvements and storm sewer <br /> improvements for City planning and financing purposes. In additi.on to this analysis, an <br /> 1326 Energy Park Drive estimate for the recycling has been included as it is possible that the County w.ould finance <br /> 51. Paul, MN 55108 that incremental amount of the project under the turn-back agreement. <br /> 612-644'4389 The estimated cast of rec.onstructi.on for the entire 2,700 foot length of Stowe Avenue, <br /> Fax; 612'644-9446 including st.orm sewer improvements, is approximately $206,500. The street improvements <br /> .9800 Shelor" Parkway would consist of the lowering of the roadway to match the existing boulevards, installing up <br /> to eight inches of gravel base, three and one half inches of bitumin.ous pavement, and <br /> concrete curb and gutter. The project cost for such reconstruction w.ould be approximately <br /> Minneapolis, MN 5544 J $270,000. This amount includes a 32% overhead factor for engineering, administration, <br /> 6) 2.546-0432 <br /> Fax: 612.544.6398 <br /> CC. 0/ 'i /1'1 a 2.{f-D.-L <br />
The URL can be used to link to this page
Your browser does not support the video tag.