My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-29-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 08-29-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:56 PM
Creation date
11/6/2006 3:27:34 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> CITY OF ARDEN HILLS <br /> . MIM)RAN[)tJM <br /> DATE: August 23, 1994 <br /> '10: Dorothy Person, City ~i,.,i strator <br /> FRCM: Dan Winkel, Public Works Superintecdent ~.JJ. <br /> SUBJECI' : Update on 1994 Road Projects <br /> The road reconstruction projects are rroving along very well. I <br /> reviewed all of the sites tcday and obseDJed the following conditions. <br /> All of the sub-cut w:Jrk has been ccrnpleted on both Dunlap Street and <br /> Bussard Court. The granular material and gravel is also in place on <br /> both of these streets. Final grading and curb w:Jrk should begin <br /> within the next couple of weeks. <br /> Ashbach Construction is arrrentl y w:Jrking an Amble Drive. <br /> Approxirrately half of the sub-cut w:Jrk is ccrnplete. The sand and <br /> . gravel is in place on the ccrnpleted half. If the weather oolds, I <br /> would anticipate that the sub-cut w:Jrk on Amble Drive w:JUld be <br /> carpleted by the middle of next week. <br /> Keithson Drive has not had \\'Ork done an it as of yet. All of the cum <br /> to be replaced has been marked for renoval. I think that the milling <br /> will be done before the new curb is installed. <br /> . <br /> - ----- ---------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.