My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-29-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 08-29-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:56 PM
Creation date
11/6/2006 3:27:34 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. CITY OF ARDEN HILtS <br /> MEM:lRANDtlM <br /> DATE: August 30, 1994 <br /> TO: Dorothy Person, City Administrator <br /> FRCM: Dan Winkel, Public tb:ks SUperintendent ~..J. <br /> SUl3JECl' : update on 1994 Pavement Management Issues. <br /> AJ: the end of tcxJay, 95% of the curl:ls and gutters will be in for the <br /> reconst:ruction roads. Final grading of the gravel and scme black <br /> topping will take place next week. <br /> Staff has had a small issue arise regarding the installation of the <br /> cmb, and how the driveways and =bs will be adjusted to match the <br /> new cmb. Sane of the residents did not understand that the driveways <br /> and yards may need to be tapered back to the property line in order to <br /> match the grade of the curl:l. Staff has evaluated each property on an <br />. individual bases to detennine where to match the existing grades. <br /> The on-site inspect= is well aware of my unusual circumstances and <br /> will over see the driveway and yard restoration. <br /> Staff has had serre phone calls regarding this issue and has rret with <br /> residents to review the situation. <br /> m:to <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.