My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-12-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 09-12-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:57 PM
Creation date
11/6/2006 3:35:28 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . <br /> REQUEST FOR PROPOSAL <br /> . CITY HALL COMPLEX AND PUBLIC WORKS/PARKS & RECREATION <br /> MAINTENANCE FACILITIES <br /> CITY OF ARDEN RILLS <br /> The city of Arden Hills is requesting proposals from <br /> architectural firms for the design of a city Hall complex and <br /> Public Works/Park and Recreation maintenance facility. <br /> Approximate size of City Hall complex would be 8,400 square <br /> feet, with an estimated cost between $670,000 to $840,000. <br /> Approximate size of Public Works/Park and Recreation maintenance <br /> facility is 24,280 square feet, with an estimated cost to be <br /> between $1,456,000 and $1,942,000. Total cost of .the entire <br /> project is estimated to be between $2,000,000 and $2,500,000. <br /> The scope of services requested will include the following: <br /> 1- An evaluation of the four sites identified in the city Hall <br /> Study committee's Report for the proposed buildings to <br /> determine the site that presents the best opportunity to <br /> maximize building function and aesthetics while minimizing <br /> cost. <br /> 2. Preparation of a building program to include project scope, <br /> . goals, budget, and schedule and any other information such <br /> as facility use, maintenance procedures and special <br /> requirements. <br /> 3. Prepare schematic design by developing initial design <br /> concept. Include rough sketch models, drawings of <br /> principal floor plans and rough preliminary estimate of <br /> construction cost. Review design approach and alternatives <br /> with Council and staff and make revisions as directed. <br /> 4. Develop final design. Establish size and character of <br /> project to show all the refinements of proposed design. <br /> Drawings should include sections, elevations showing <br /> exterior treatment, site plan with grading and general <br /> landscape. Prepare rough or outline specifications. <br /> 5. Prepare construction documents, drawings/specifications. <br /> Evaluation of proposals will consist of the following: <br /> 1- Ability to develop and complete the program, provide <br /> estimates, plan layouts and outline specifications within <br /> the deadlines. <br /> 2 . Ability to translate and execute the program into schematic <br /> design, design development drawings and construction <br /> . documents. <br /> (over) <br />
The URL can be used to link to this page
Your browser does not support the video tag.