My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-21-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 09-21-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:58 PM
Creation date
11/6/2006 3:35:32 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> DRAFT <br /> September Planning Minutes Page 6 09/07/94 <br />. Chair Winiecki asked if there would be any curb stops in the <br /> parking lot. <br /> Mr. Gregoret stated no. He would like to keep the parking lot <br /> clear so the snow plow can clear the lot off better. <br /> Chair Winiecki asked if topsoil would be brought in. <br /> Mr. Gregoret stated so far, they have enough soil and none will <br /> need to be brought in. A structural engineer will determine if <br /> there would need to be any additional soil, <br /> Chair Winiecki asked whose responsibility it is to coordinate the <br /> service schedules together with North Heights Church. <br /> Reverend Stefan Zencuch stated the church is in good standing <br /> with North Heights Lutheran Church. Their services are held at 9 <br /> a.m. and 11 a.m. Our services are held at 10 a.m. They have been <br /> very good to us and in many cases, they will help us with <br /> parking, <br />. Chair Winiecki asked about planting pine trees for screening. <br /> Mr. Gregoret stated they are planning to plant some spruce trees <br /> around the area. These plans will they be ready for the City <br /> Council meeting. <br /> Chair Winiecki also asked about screening for the roof top <br /> heating and cooling units. <br /> Mr. Gregoret stated the roofs are pitched, and the units will be <br /> placed in a cut-away format. There will be two separate units <br /> one for the church and one for the Cultural Center, <br /> Chair Winiecki stated the applicant should work with staff on the <br /> screening, <br /> Mr. Larson asked if the building would be built in phases since <br /> money, in the past, has been a problem, <br /> Mr. Gregoret stated they are currently planning to build the <br />. whole project all at once. Then, if the bids come in higher than <br />
The URL can be used to link to this page
Your browser does not support the video tag.