My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-10-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 10-10-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:01 PM
Creation date
11/6/2006 3:35:46 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . <br /> . <br /> . (G) In addition to the above fees: <br /> (1) A charge of ~ $3.00 will be made for each street <br /> lighting standard. <br /> (2) A charge of $3:00 $4.00 will be made for each traffic signal <br /> standard. Circuits originating within the standard will not be used <br /> when computing fees. <br /> (H) In addition to the above fees, all transformers and generators for light, heat, and <br /> power shall be computed separately at $6,00 $8.00 plus 3Gt 40~ per KV A up to <br /> and including 100 KV A. 101 KV A and over at ~ 30t per KV A. The maximum <br /> fee for any transformer or generator in this category is $60.90 $80.00. <br /> (1) In addition to the above fees, all transformers for signs and outline lighting shall be <br /> computed at ~ $7.00 for the first 500 V A or fraction thereof per unit, plus <br /> 5G; 70~ for each additional 100 V A or fraction thereof. <br /> (J) In addition to the above fees, unless included in the maximum fee filed by the <br /> initial installer, remote control, signal circuits, and circuits ofless than 50 volts <br /> . shall be computed at ~ $5.00 per each ten openings or devices of each <br /> system plus ~ $3.00 for each additional ten or fraction thereof. <br /> (1<) In addition to the above fees, the inspection fee for each separate inspection of a <br /> swimming pool shall be computed at $29.ee $25.00. Reinforcing steel for <br /> swimming pools requires a rough-in inspection. <br /> (L) For the review of plans and specifications of proposed installations, there shall be a <br /> minimum fee of $125.00 $150.00 up to and including $30,000 of electrical <br /> estimate, plus 1/10 of 1% on any amount in excess of$30,OOO to be paid by <br /> persons or firms requesting the review. <br /> (M) When r.einspection is necessary to detennine whether unsafe conditions have been <br /> corrected and such conditions are not subject of an appeal pending before any <br /> court, a reinspection fee of $IS.0fJ $22.00 may be assessed in writing by the <br /> Inspector. <br /> . <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.