My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-10-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 10-10-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:01 PM
Creation date
11/6/2006 3:35:46 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . <br /> (N) For inspections not covered herein, or for requested special inspections or <br /> . services, the fee shall be $2El.OEl $30.00 per man hour, including travel time, plus <br /> '*f 25~ per mile traveled, plus the reasonable cost of equipment or material <br /> consumed. This section is also applicable to inspection of empty conduits and such <br /> jobs as determined by the city. <br /> (0) For inspection of transient projects, including but not limited to, carnivals and <br /> circuses, the inspection fees shall be computed as follows: <br /> Power supply units according to item (B) offee schedule. <br /> A like fee will be required on power supply units at each <br /> engagement during the season, except that a fee of $20.00 <br /> $25.00 per hour will be charged for additional time <br /> spent by the Inspector, if the power supply is not ready for <br /> inspection as required by law. <br /> Rides, Devices, or Concessions: Shall be inspected at their <br /> first appearance of the season and the inspection fee shall <br /> be $15.00 $20.00 per unit. <br /> . <br /> . <br /> 3 <br /> -------..-- ----- <br />
The URL can be used to link to this page
Your browser does not support the video tag.