Laserfiche WebLink
<br />---------------- ____on <br /> . <br />Honorable Mayor and City Council . <br />August 18, 1994 <br />Page Four <br /> mile in the City of Arden Hills was $27,749.00. This would be approximately the <br /> amount of additional construction dollars the City would receive per mile for each <br /> County Road placed on the MSA system but not totally reconstructed. In other <br /> words, if the County were to bring a roadway to level 90 and turn it back to the City, <br /> and the City were to place it on their Municipal State Aid system, this would be the <br /> increase in annual allotment that could be expected. Assuming the City would choose <br /> to reconstruct County Road F before placing it on the system, and possibly <br /> reconstruct Stowe Avenue or not be allowed to place it on the MSA system, the <br /> following list indicates what the City might expect in additional annual Slate Aid <br /> construction funds should the remaining roads be turned back and placed on the City <br /> system. <br /> MSA Annual <br /> Spg:J1'pnt Miles A. J1n...~tjnn <br /> County Road F 0.92 -0- <br /> Hamline Avenue 0.32 $ 8,880.00 <br /> Ingerson Road 0.49 13,597.00 <br /> Lake Johanna Boulevard 0.83 23,032.00 <br /> Snelling Avenue 0.13 3,607.00 <br /> Stowe Avenue 0.25 -0- . <br /> Estimated Total Annual MSA Allocation Increase $49,116.00 <br /> If a roadway on the MSA system is reconstructed, the City no longer receives needs <br /> for total reconstruction. However, a minimal amount of the annual needs is provided <br /> based on an overlay of the road. Twenty years after the date of reconstruction, the <br /> roadway begins to again receive full reconstruction needs. <br />E. CONCLUSIONIRECO.MMEi'IDA TION <br /> The County has indicated they would like to accomplish the turnback of all roadways <br /> within a ten year window. They have,asked each City to review the roadways within <br /> their community and indicate to the County the type of turnback option they would <br /> see utilizing and the time frame to do that. It would be my recommendation that <br /> County Road F would be reconstructed under Turnback Option 2 as quickly as <br /> possilile. Stowe Avenue is the only other roadway that would reasonably make sense <br /> to utilize Option 2 for reconstruction. Since it may be questionable whether this one <br /> may be placed on the MSA system after turnback, the timing of the reconstruction <br /> would be based on the City's desires and ability to fund other improvements <br /> associated with reconstruction, such as the relaying of the sanitary sewer line in that <br /> area. The remaining roadways I believe all fall under Turnback Option 1 where the . <br /> County does minimal work to bring the roadway to level 90, turns it back to the City, <br /> and the City in turn places it on its Municipal Slate Aid system. The two scenarios <br /> that seem to make sense here would be to either take these roadways as quickly as <br />5201043~ 1802.;lUg <br />