Laserfiche WebLink
<br /> . . <br /> . CITY OF ARDEN HILLS <br /> .- MEMORANDUM <br /> DATE: February 23, 1995 <br /> . TO: Mayor and Council <br /> . FROM: Dan Winkel, Public Works Superintendent b.w. <br /> SUBJECT: National Guard Reserve,sanitary Sewer and Water Site Plan Review. <br /> . Staff has reviewed the Melchert\B1ock Associates proposed Sanitary Sewer and Water plans for <br /> the National Guard Reserve Center. After examining the available Sanitary Sewer connections, <br /> I staff has developed an alternate to the Melchert\B1ock proposal. Alternate B, as described in the <br /> February 6, 1995 letter from City Engineer Greg Stonehouse is the staff recommended <br /> . connection method. The estimated cost for installing the staff recommended connection should <br /> be very close to the Melchert\Block proposed plans expenditure. As noted in Mr. Stonehouse's <br /> letter, Alternate B will have the least amount ofrestoration needed on Hamline Avenue, with the <br /> . water connection work taking place off of the main roadway. The staff recommended water <br /> main connection should be a 12-inch size pipe jacked under County Highway 96. <br /> .. Staffhas met with Mr. Block from Melchert\Block to discuss the Alternate B plans. Mr. Block <br /> has agreed the Alternate B is feasible and is preparing plans and specifications for this proposal. <br /> Both staff and Mr. Block will be reviewing the proper lift station size needed for this area. <br /> . The second part of this proposal is the need for a connection agreement between the National <br /> Guard Reserve and Arden Hills. Based on the fact that staff and Mr. Block are somewhat in <br /> . agreement as to the [mal plans and specifications, it is being requested that Council authorize <br /> staff to negotiate a connection agreement between National Guard Reserve and Arden Hills. <br /> . DW\jt <br /> . <br /> . <br /> . <br /> . <br /> .. <br /> . <br />