My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-17-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 04-17-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:17 PM
Creation date
11/6/2006 4:16:09 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . ,:;ItP~-13-9~ FRI 07:44 QM DB.C 636 3331 p.a3 <br /> -- <br /> .. Citizen Contract for Arden HlIIs <br /> . Heres a small liSl of problems ove,. tire past several yttars we have obserVed in OUT fair City. if yours is not <br /> inc!lIdlld please add it. We believe Oll1' respOnsll showd be 10 dll1lelop a belle,. process whllTeby OUT City <br /> government will be mOTe responsive to us Citizens: <br /> . Keithison Dr.-An entire development enginHred and completed in 1988 suffers flooding alter the <br /> drought, requiring condemnation of property for a drain, rebuilding of roadway and special <br /> . assessments for all residents. No one is held responsible. <br /> Economic Redevelopment.- Where is our business corridor at Ihe south end of Round Lake? It <br /> . staned with purchase of the old ADM site and pollution cleanup. We now have over $ 400,000 <br /> invested and not one stick of development. What about commercial vacancies and small business <br /> suppon for local businesses in other areas of the City? <br /> . City Planning- It has been revealed during recent public hearings that Arden hills has done no real <br /> comprehensive planning to date. The City's comprehensive plan is merely the penciled in version <br /> . of preexisting historical uses. Similarly there is no plan to connect and improve citizen access to the <br /> palts of the city separated by major traffic corridors. The City contlnlJ6s to purslJ6 multiunit PUD <br /> type developments. to be put up fast in marginal land use areas around the City. The proven <br /> . results in the long term from this type of development are; traffic congestion, potential tax increases <br /> for additional services such as sewer and water, fire, police, schools, and disruption of sensitive <br /> natural areas. <br /> .- W CO Rd F Reconstruction- The City plans to tum this road into an Indy 500 raceway for High <br /> School studenrs. The City took tfle road back from the County and immediately planned an <br /> . enlarged thoroughfare (hat does not meet tfle needs of rhe residents. T1le City would not even <br /> allow a two week delay for reconsideration of the plan over Objections of a majority of neighborhood <br /> ff1sidents affected by the projsct. The City is using 225,000 of funds from a special Citywide tax on <br /> . your water I,ifl for this proiect. <br /> Townhomes of Lake Valentlne- A project /hat passed through the planning commission 5-1 over <br /> . objections of 50-100 residents. It is proposed to be built upon a questionable piece of land <br /> adjoining Lake Valentine that has been rejected for development twice before. Vsry few conditional <br /> uses were attached even tflough the developer plans to send runoff from the project into Lake " <br /> . Valentine via a culvett that the City will have 10 maintain in the future. No soil tests were made and <br /> some of the engineering was presented on stationary of a concrete firm. <br /> . The Arsenal-Arden Hills City fathers/mothers are singularly focused on a project to build a City Hall <br /> and County Maintenance base on beautiful Sunfish Lake k>catsa at 96 and Hamllns in the Arsenal <br /> property. This Lake has been home to nesting Loons and the threatened and rare blandings turtle. <br /> Orher plans for the Arsenal include extensive R1 residential devopment. These projects will increase <br /> . traffic on 96. Hamline and Hwy 10 already two of the busiest corridors in the City. The City owns <br /> property across 96 to the east of the current City Hall but has refused to modify its plans to build <br /> mere after being tumed down in a City referendum vote. <br /> . Can ~ On Ben",,_? ~ Thil.Ik SQ And HctU lilnY:. <br /> .. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.