My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-10-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 04-10-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:18 PM
Creation date
11/6/2006 4:16:11 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> M~ I <br /> I i <br /> I April 4, 1995 <br /> III.ISIL'!'I\I. EIIlIIEERS File: 520-052-30 <br /> I 1326 Energy Park Drive <br /> SI Paul, MN 55108 Honorable Mayor and City Council <br /> I 6116444389 City of Arden Hills <br /> 1-800-888-1913 1450 West Highway 96 <br /> Fox 61164H446 Arden Hills, Minnesota 55112 <br /> I RE: COUNTY ROAD F RECONSTRUCTION <br /> BID OPENING <br /> I Dear Mayor and Council: <br /> I The City of Arden Hills received bids for the referenced project on March 30, 1995 at City <br /> Hall. Enclosed is a tabulation of bids from the opening. The bid opening resulted in the <br /> I following. <br /> (IV" ENGI\j::).:i\JG <br /> .NVIRONMENTAL The City received, by 10:30 a.m., four bids. The Contractors' proposals ranged from a <br /> I ~,U!\IClFA.L low bid of $798,808.45 as submitted by Midwest Asphalt, Inc., to a high bid of <br /> PLANNING $961,344.90 as submitted by Valley Paving, Inc. The Engineer's estimate for this work <br /> W_~D\r'i'ASTE was determined using the mean bid from 1994 and a 4 % inflation factor. <br /> I STRUCT.JRp,L <br /> Sl/<V:YING The bids for this project are presented on the enclosed bid tabulation. According to the low <br /> TRAFFIC bidder, the main reason for the lower bid price is the proximity of their New Brighton <br /> I TRA~S;lm~ATION asphalt plant to the project. The Ihree low bids were as follows: <br /> :":CTRICAj'MKHA\I:CAL rONTRArmR RASE mo PROPOS A T <br /> I :~GINE[RING <br /> l\,'AC Midwest Asphalt, Inc. $798,808.45 <br /> PO'wTRDIST\ljU-lm, Eden Prairie, MN <br /> I SCACA <br /> SYSTEM CON~ROLS Ashbach Construction, Inc. $877,644.78 <br /> I St. Paul, MN <br /> Arnt Construction, Inc. $942,544.84 <br /> I Hugo, MN <br /> The Engineer's estimate as prepared upon completion of the plans, was approximately <br /> I $900,000 (total construction cost). The relative spread of contractor proposals was <br /> approximately $160,000 and the average bid, $895,000, was within 1 % of the Engineer's <br /> _FICES IN estimate. <br /> I INNEAPOUS <br /> PRIOR LAKE <br /> SI. PAUL <br /> I WASECA <br />
The URL can be used to link to this page
Your browser does not support the video tag.