My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-30-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 05-30-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:21 PM
Creation date
11/6/2006 4:24:09 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> . <br /> Uudated Cost Estimate for the uroiect .1 <br /> The cost estimate by Maier Stewart Associates is $362,750. This is considerably less than was <br /> previously estimated. The bid would include an alternate for the lighting of the SW field and the <br /> parking lot. The playground structure is not included in the price estimate or bids. I would like I <br /> to choose that structure and obtain bids separately. It does have to be installed by December of <br /> 1997 as a requirement of the grant. Additional fundraising will continue in an attempt to raise . <br /> funds for the installation of this structure in 1996 or Spring of 1997. <br /> I have written several grants to local foundations that I have not heard from. It is my intention to . <br /> continue fundraising. Additional money may be needed for lights, unless the bids received are less <br /> than estimated. The storm drainage construction and erosion control for the project total $22,000 <br /> (see Maier Stewart Cost Estimate). It is my assumption that this amount would come out Qfthe . <br /> Storm Water Management Fund. Any money raised for this project beyond what is needed for <br /> improvements and the playground structure will be used to replenish the $200,000 used from the <br /> park fund. The park fund currently has a balance of approximately $600,000. . <br /> Conclusion <br /> The proposed project will address and correct the Americans with Disability Act inaccessibility, I <br /> safety concerns, and the drainage and erosion problems that currently exist. Engineer Stonehouse <br /> feels confident that the bids will be received in the range of the updated estimate he has provided. . <br /> The proposed plan has been shared with the Ramsey County Sheriff under Sheriff, John Louey. <br /> He is pleased with the design and anticipates that it will help to decrease the amount of vandalism <br /> and unwanted activity that currently exists in the park. -I <br /> Attachments: resolution & price estimate I <br /> CSW:jt I <br /> . <br /> . <br /> . <br /> . <br /> . <br /> -. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.