My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-18-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 05-18-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:22 PM
Creation date
11/6/2006 4:24:16 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> I <br /> .- CITY OF ARDEN HILLS <br /> MEMORANDUM <br /> I DATE: May 16, 1995 <br /> I TO: Mayor and City Council <br /> Brian Fritsinger, Administrat~ <br /> I FROM: <br /> SUBJECT: Ventilation of Public Works Garage <br /> I Attached the Council will find quotes for the replacement of the ventilation/exhaust system <br /> I at the Public Works garage, The poor ventilation within the facility has been cited by the <br /> former Public Works Director as a problem several times in the past and identified as <br /> something which needed to be corrected, <br /> . The previous cost estimates for this correction had only been a fraction of the quotes <br /> received. The quotes received are: <br /> .e I. Harris Air Systems - $3,095 <br /> . 2. Rainville-Carlson, Inc, - $12,080 <br /> 3, Cool Air Mechanical, Inc, - $5,395 <br /> 4. Albers - $5,518 <br /> I Each ofthese quotes is substantially different and most did not include any cost for electrical <br /> and rooting. I reviewed these items with Dave Kriesel and Eugene Pakoy. In investigating <br /> I the situation both inspectors suggested that only the Rainville-Carlson quote actually <br /> resolves the existing problem. <br /> I The City has within the 1995 budget $3,000 specified for building structure improvements. <br /> The remainder ofthis cost could be transferred from the Special Building Fund. Rather than <br /> incurring these costs at this time, Staff would recommend the Council continue to develop <br /> I its options for new facilities over the next several months, The Council can then rebid this <br /> project or direct Staff to have the project completed prior to winter. <br /> I <br /> I <br /> Ie <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.