My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-06-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 07-06-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:26 PM
Creation date
11/6/2006 4:24:27 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />/ <br />1< <br />I <br />I- BRW, Inc <br /> May 8. 1995 <br /> Revised May 12. 1995 <br />I DRAFf GOALS AND OBJECTIVES <br />, <br />I GOAL 1. Develop a concept plan that will optimize public safety. <br /> Stratel!:ies <br />I 0 Restrict and consolidate access wherc appropriate. <br /> I ~. <br /> 0 Use a design speed which is consistcnt with the function and use of the highway. <br />I 0 Provide for cmergency vehicle use in the corridor. <br />I 0 Provide rum lanes. by-pass lanes, and other traffic movement controls where <br /> needed. <br />I- 0 Provide increased lighting throughout the corridor and especially at interSections. <br /> GOAL 2. Provide improvements needed to meet the forecast vehicle traffic demand for <br />I Highway 96 as an "A" Minor Arterial. <br />I S tratel!:ies <br /> 0 Design should provide for average travel speeds through the corridor of 30 to 35 <br /> miles per hour. <br />I 0 Design of the roadway should consider importance of commerce in the corridor <br /> and thc need to accommodate trucks. <br />I 0 Forecasts for the roadway should anticipate potential future development in the <br /> corridor. <br />I <br />I <br />I <br />I- I <br />I <br /> -------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.