Laserfiche WebLink
<br /> I <br />~ <br />M~A- July 26, 1995 .1 <br /> I <br />i File: 520-055-10 <br />COIISUL TI:IG HNGI\EEIl!l <br />1326 Energy Park Dr"e Honorable Mayor and City Council j\A 26 '9Qh I <br /> I.......J <br />St. Paul, MN 55108 City of Arden Hills <br />612.6.\4-4389 1450 West Highway 96 ;,,:'" ~. I <br /> '.., <br />1.800,888.2923 Arden Hills, MN 55112 <br />Fax: 612.644.9446 I <br /> RE: CHARLES PERRY PARK <br /> BID OPENING <br /> Dear Mayor Probs!: . <br /> The City of Arden Hills received bids for the referenced project on July 13, 1995, at City I <br /> Hall. Enclosed is a tabulation of bids from the opening, The bid opening resulted in the <br /> following: <br /> The City received, by 11: 30 a.m., nine bids. The Contractors' proposals ranged from a . <br />CIVil ENGINEERING: low bid of $222,575.00 as submitted by Veit & Company, to a high bid of $512,485.75 <br />ENVIRONMENTAL as submitted by Jay Brothers, Inc. The Engineer's estimate for this work was determined -. <br />MUNICIPAL using the mean bid from 1994 and a 4 % inflation factor. The three low bids were as <br />PlANNiNG follows: <br />SOUD WASTE . <br />STRUCTURAl CONTRACTOR BASE BID PROPOSAL <br />SURVEYING <br />TRAFFIC Veit & Company, Rogers, Minnesota $222,575.00 I <br />TRANSPORTATION <br />ELECTRICAL! MECHANICAL Aero Asphalt, Inc., Rogers, Minnesota $232,645,70 I <br />ENGINEERING <br />HVAC F.M. Frattalone, LillIe Canada, Minnesota $265,785:?O <br />POWER DISTRIBUTION I <br />SCADA The Engineer's estimate, as prepared upon completion of the plans, was approximately <br />SYSTEM CONTROlS $230,000 (total base bid construction cost), The relative spread of Contractor proposals <br /> was approximately $298,000, and the low bid was approximately 3% lower than the I <br /> Engineer's estimate. <br /> The low bidder, Veit & Company, has completed numerous projects for MSA in Elk River . <br /> and East Bethel; however, none have been in Arden Hills. The work Veit has been <br /> involved with has been completed to satisfactory standards of the construction industry, <br /> We find Veit & Company to be a responsible and competent contractor, and would . <br /> recommend that they be awarded the contract for the Charles Perry Park Improvements <br />OFFICES iN: project at the July 31, 1995, City Council meeting. - <br />MINNEAPOLIS I <br />PRIOR lAKE <br />ST. PAUL . <br />WASECA <br /> 5201055~ 1902.jul <br />