Laserfiche WebLink
<br /> . <br /> . maintenance. In general, the pumps have been running well according to operating personnel. <br /> .- Preliminary Recommendations: <br /> In general the station is in good condition and the routine maintenance program is doing <br /> . as good job of maintaining the facility. The wet well has some safety considerations which are <br /> known by operating personnel and safety precautions are obsetved when working in this <br /> enVlfonment. <br /> . Lift St:ltion Number 3 <br /> . Location: County Road E and Siems Court <br /> Type: Wet weIll Dry well <br /> Manufacturer: Cantex with Fairbanks Morse Pumps <br /> . Construction: Steel Tube wet well, Concrete Dry well <br /> Design Capacity: 150 gpm at 48 feet TOH <br /> Constlucted: 1960, replaced one pump volute and repaired one volute in July 1995 <br /> . Comments: <br /> . The dry well tube appears to be leaning slightly but it is difficult to determine whether this <br /> has always been the case or it occurred in the recent past. The dry well appears to be in fair <br /> condition but the floor is corroded and there is standing water on the floor opposite the sump <br /> .. pump. <br /> The wet well is a four (4) foot diameter concrete structure which appears to be in good <br /> condition. <br /> . According to operating personnel, this station has ben operating reasonably well and <br /> required only routine maintenance except for the volute replacement in the summer of 1995. <br /> . Preliminary Recommendations: <br /> The dry well should be monitored to determine whether or not the vertical alignment is <br /> continuing to deteriorate. 10 addition the dry well should be cleaned and recoated to provide <br /> . corrosion resistance. It may be possible to correct the "wet floor" problem due to the uneven <br /> floor with some filler material following the cleanup of the floor. <br /> . Lift St:ltion Number 4 <br /> Location: Arden Place <br /> I Type: Wet wel1' Dry well <br /> Manufacturer: Cantex with Fairbanks Morse Pumps <br /> . ConstlUction: Concrete wet well, Steel tube dry well <br /> Design Capacity: 200 gpm at 48 feet TOH <br /> Constructed: 1960 <br /> . In 1993, replaced one pump impeller and volute and rebuilt the one motor. <br /> Comments: <br /> .- There is some corrosion on the drv well cover and the interior of the access tube. The drv <br /> - - <br /> I <br />