Laserfiche WebLink
<br /> u ____~__ ______ <br /> I' <br /> / <br /> I. TH 96 0 Urban Design Enhancement Program - DRAFT <br /> August 7, 1995 <br /> Page 7 <br /> I Table I <br /> I Improvement Component Costs <br /> Concept Cost Estimate <br /> I No. Item Unit Quant * Unit Cost Item Cost * <br /> I 1. Street Lights @ 300' O.c. Each 0.003 $4,000.00 $12.00 / L.F. <br /> (Cost for One Side of Roadway Only <br /> I Including Foundations and Wiring) <br /> 2. Trail/WaIk Lights @ 150' O.c. Each 0.006 $2,500.00 $15.00 / L.F. <br /> I (Cost for One Trail or Walk Only <br /> Including Foundations and Wiring) <br /> I 3, Walkway (6' Wide - 4" Concrete) S.F. 6 $2.50 $15,00 / L.F. <br /> (Cost for One Side of Roadway Only) <br /> Ie 4. Trail (10' Wide - Bituminous) S.F. 10 $1.50 $15.00 / L.F. <br /> (Cost for One Side of Roadway Only) <br /> I 5. Landscaping - Boulevard or Median <br /> (Cost for One Side of Roadway Only <br /> I or for Median) <br /> a. Low, Level Treatment Each 0.005 $300.00 $1.50 / L.F. <br /> I (1 Tree /200 L.F,) <br /> b. Medium-Level Treatment 0.01 $300.00 $3.00 / L.F, <br /> Each <br /> I (1 Tree / 100 L.F.) <br /> ~,', <br /> c. High-Level Treatment Each OJl2 -", $300.00 $6.00 / L.F. <br /> I (1 Tree / 50 L.F.) <br /> - <br /> 6. Landscaping - Special Focal Area L.S. A $15,000.00 $15,000.00 / Area <br /> I (Trees, Shrubs and/or Rowers <br /> Including Edging, Irrigation, and <br /> Miscellaneous Items; 3,000 S.F. <br /> I per Focal Area @ $ 5.00 / S.F.) <br /> I. 0 <br /> * Per Lineal FOOl of Roadway or Special Treatment Area <br /> ~ <br /> I <br /> ~. <br />