My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-13-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 11-13-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:38 PM
Creation date
11/6/2006 4:40:28 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . <br /> I - <br /> ~ <br /> I. - <br /> - <br /> CORRIDOR ENHANCEMENT COSTS -, <br /> I Tables 2 through 4 provide cost estimates for various levels of treatment for the whole Highway - <br /> 96 corridor. The tables identify: individual item costs; total urban design enhancement costs; - <br /> I costs per lineal foot of roadway; and three breakdowns of the total enhancement costs -- a.) for - <br /> the trail and walkways, b.) for items which are eligible for State Aid Funding, and c.) for items - <br /> which are not eligible for State Aid Funding. The trail and walkway costs are listed separ.ately, - <br /> I since a determination needs to be made regarding the funding of these items. _ i <br /> I =-1 <br /> - <br /> I _l <br /> - <br /> I =-1 <br /> I :l <br /> = <br /> I. .-j <br /> - <br /> I :.J <br /> - <br /> - <br /> - <br /> I _I <br /> I _I <br /> - <br /> I J <br /> -.,.-- <br /> - <br /> I .',. .1 <br /> I .J <br /> I .J <br /> I. . .J <br /> I 63 J <br /> T <br />
The URL can be used to link to this page
Your browser does not support the video tag.