Laserfiche WebLink
Attachment C <br />Arden Oaks Park I Arden Hills, MN Preliminary Cost Estimate <br />Identified Improvements Unit Qty I Unit Cost I Estimated Cost <br />Playground replacement - existing containers <br />$171,080.00 <br />Remove existing playground <br />Lump Sum <br />1 <br />$3,000.00 <br />$3,000.00 <br />Playground equipment <br />Lump Sum <br />1 <br />$80,000.00 <br />$80,000.00 <br />Playground installation <br />Lump Sum <br />1 <br />$32,000.00 <br />$32,000.00 <br />Plastic play area perimeter - plastic <br />Lin Ft <br />320 <br />$10.00 <br />$3,200.00 <br />Playground surfacing - wood fiber <br />cubic yards <br />80 <br />$50.00 <br />$4,000.00 <br />Alternate Surfacing: Poured In Place Rubber <br />Sq Ft <br />2100 <br />$25.00 <br />$52,500.00 <br />Design/Engineering/Consulting <br />20% <br />$24,440.00 <br />Construction Contingency <br />20% <br />$24,440.00 <br />Playground replacement - upgraded concrete containers <br />$193,340.00 <br />Remove existing playground <br />Lump Sum <br />1 <br />$3,000.00 <br />$3,000.00 <br />Playground equipment <br />Lump Sum <br />1 <br />$80,000.00 <br />$80,000.00 <br />Playground installation <br />Lump Sum <br />1 <br />$32,000.00 <br />$32,000.00 <br />Concrete play area perimeter (8" wide curb) <br />Lin Ft <br />320 <br />$40.00 <br />$12,800.00 <br />Site Grading <br />Sq Ft <br />2100 <br />$3.00 <br />$6,300.00 <br />Playground surfacing - wood fiber <br />cubic yards <br />80 <br />$50.00 <br />$4,000.00 <br />Alternate Surfacing: Poured In Place Rubber <br />Sq Ft <br />2100 <br />$25.00 <br />$52,500.00 <br />Design/Engineering/Consulting <br />20% <br />$27,620.00 <br />Construction Contingency <br />20% <br />$27,620.00 <br />Playground replacement (combine into one container & upgraded amenities) <br />$315,490.00 <br />Remove existing playground <br />Lump Sum <br />1 <br />$3,000.00 <br />$3,000.00 <br />Playground equipment <br />Lump Sum <br />1 <br />$130,000.00 <br />$130,000.00 <br />Playground installation <br />Lump Sum <br />1 <br />$52,000.00 <br />$52,000.00 <br />Concrete play area perimeter <br />Lin Ft <br />250 <br />$35.00 <br />$8,750.00 <br />Site grading <br />Sq Ft <br />4000 <br />$3.00 <br />$12,000.00 <br />Playground surfacing - wood fiber <br />cubic yards <br />152 <br />$50.00 <br />$7,600.00 <br />Drain Tile (Includes Cleanouts + Rock) <br />Lin Ft <br />400 <br />$30.00 <br />$12,000.00 <br />Alternate Surfacing: Poured In Place Rubber <br />Sq Ft <br />4000 <br />$25.00 <br />$100,000.00 <br />Design/Engineering/Consulting <br />20% <br />$45,070.00 <br />Construction Contingency <br />20% <br />$45,070.00 <br />Picnic Shelter <br />$82,600.00 <br />Picnic shelter (16'x16') Metal Construction <br />Each <br />1 <br />$50,000.00 <br />$50,000.00 <br />Concrete pad (4" Concrete) <br />Sq Ft <br />600 <br />$12.00 <br />$7,200.00 <br />Site Grading/Prep <br />Sq Ft <br />600 <br />$3.00 <br />$1,800.00 <br />Design/Engineering <br />20% <br />$11,800.00 <br />Construction Contingency <br />20% <br />$11,800.00 <br />Shade Structure <br />$12,600.00 <br />Shade sail over picnic table <br />Each <br />1 <br />$4,500.00 <br />$4,500.00 <br />Installation <br />Each <br />1 <br />$4,500.00 <br />$4,500.00 <br />Design/Engineering <br />20% <br />$1,800.00 <br />Construction Contingency <br />20% <br />$1,800.00 <br />Basketball Court Resurfacing <br />$11,760.00 <br />Mill + Overlay of basketball court <br />Sq. Yd. <br />140 <br />$32.00 <br />$4,480.00 <br />Acyrlic Painting <br />Sq. Yd. <br />140 <br />$28.00 <br />$3,920.00 <br />Design/Engineering <br />20% <br />$1,680.00 <br />Construction Contingency <br />20% <br />$1,680.00 <br />Page 1 of 3 <br />