My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-24-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
06-10-24-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 10:04:15 AM
Creation date
6/14/2024 8:20:40 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arden Oaks Park I Arden Hills, MN <br />Preliminary Cost Estimate <br />Basketball Hoops <br />$15,400.00 <br />Basketball Hoops <br />Each <br />2 <br />$5,000.00 <br />$10,000.00 <br />Installation <br />Each <br />2 <br />$500.00 <br />$1,000.00 <br />Design/Engineering <br />20% <br />$2,200.00 <br />Construction Contingency <br />20% <br />$2,200.00 <br />Bicycle Parking <br />$1,304.80 <br />Bicycle Parking <br />Each <br />1 <br />$500.00 <br />$500.00 <br />Concrete Pad (4" Thick) <br />Scl Ft <br />36 <br />$12.00 <br />$432.00 <br />Design/Engineering <br />20% <br />$186.40 <br />Construction Contingency <br />20% <br />$186.40 <br />Restroom <br />$3,091.20 <br />Concrete pad <br />Scl Ft <br />64 <br />$12.00 <br />$768.00 <br />Screen Fence - wood/metal <br />Lin Ft <br />24 <br />$60.00 <br />$1,440.00 <br />Design/Engineering/Consulting <br />20% <br />$441.60 <br />Construction Contingency <br />20% <br />$441.60 <br />Benches <br />$10,640.00 <br />Bench <br />Each <br />4 <br />$1,500.00 <br />$6,000.00 <br />Concrete pad (^32 SF) <br />Each <br />4 <br />$400.00 <br />$1,600.00 <br />Design/Engineering/Consulting <br />20% <br />$1,520.00 <br />Construction Contingency <br />20% <br />$1,520.00 <br />Picnic Table <br />$7,000.00 <br />Picnic Table <br />Each <br />2 <br />$1,600.00 <br />$3,200.00 <br />Concrete pad (-84 SF) <br />Each <br />2 <br />$900.00 <br />$1,800.00 <br />Design/Engineering/Consulting <br />20% <br />$1,000.00 <br />Construction Contingency <br />20% <br />$1,000.00 <br />Trash receptacles <br />$2,772.00 <br />Trash receptacles <br />Each <br />2 <br />$800.00 <br />$1,600.00 <br />Concrete pad (-16 SF) <br />Each <br />2 <br />$190.00 <br />$380.00 <br />Design/Engineering/Consulting <br />20% <br />$396.00 <br />Construction Contingency <br />20% <br />$396.00 <br />Dog Waste Stations <br />$700.00 <br />Dog waste stations <br />Each <br />1 <br />$500.00 <br />$500.00 <br />Design/Engineering <br />20% <br />$100.00 <br />Construction Contingency <br />20% <br />$100.00 <br />Park Entrance Sign <br />$7,000.00 <br />Entrance signs <br />Each <br />1 <br />$5,000.00 <br />$5,000.00 <br />Design/Engineering <br />20% <br />$1,000.00 <br />Construction Contingency <br />20% <br />$1,000.00 <br />GaGa Ball Pit $2,450.00 <br />Materials <br />Each <br />1 <br />$1,750.00 <br />$1,750.00 <br />Design/Engineering <br />20% <br />$350.00 <br />Construction Contingency <br />20% <br />$350.00 <br />Accessible Trail Construction <br />$21,420.00 <br />Trail construction to playground and bathroom (8' Wide) <br />Lin Ft <br />150 <br />$34.00 <br />$5,100.00 <br />Establish trail connection at Arden Oaks Ct. <br />Lin Ft <br />300 <br />$34.00 <br />$10,200.00 <br />Design/Engineering/Consulting <br />20% <br />$3,060.00 <br />Construction Contingency <br />20% <br />$3,060.00 <br />Accessible route to picnic shelter <br />$2,380.00 <br />Trail construction - 8' Wide Bituminous <br />Lin Ft <br />50 <br />$34.00 <br />$1,700.00 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.