Laserfiche WebLink
Arden Oaks Park | Arden Hills, MN Preliminary Cost Estimate <br />$15,400.00 <br />Basketball Hoops Each 2 $5,000.00 $10,000.00 <br />Installation Each 2 $500.00 $1,000.00 <br />Design/Engineering $2,200.00 <br />Construction Contingency $2,200.00 <br />$1,304.80 <br />Bicycle Parking Each 1 $500.00 $500.00 <br />Concrete Pad (4" Thick)Sq Ft 36 $12.00 $432.00 <br />Design/Engineering $186.40 <br />Construction Contingency $186.40 <br />$3,091.20 <br />Concrete pad Sq Ft 64 $12.00 $768.00 <br />Screen Fence - wood/metal Lin Ft 24 $60.00 $1,440.00 <br />Design/Engineering/Consulting $441.60 <br />Construction Contingency $441.60 <br />$10,640.00 <br />Bench Each 4 $1,500.00 $6,000.00 <br />Concrete pad (~32 SF)Each 4 $400.00 $1,600.00 <br />Design/Engineering/Consulting $1,520.00 <br />Construction Contingency $1,520.00 <br />$7,000.00 <br />Picnic Table Each 2 $1,600.00 $3,200.00 <br />Concrete pad (~84 SF)Each 2 $900.00 $1,800.00 <br />Design/Engineering/Consulting $1,000.00 <br />Construction Contingency $1,000.00 <br />$2,772.00 <br />Trash receptacles Each 2 $800.00 $1,600.00 <br />Concrete pad (~16 SF)Each 2 $190.00 $380.00 <br />Design/Engineering/Consulting $396.00 <br />Construction Contingency $396.00 <br />$700.00 <br />Dog waste stations Each 1 $500.00 $500.00 <br />Design/Engineering $100.00 <br />Construction Contingency $100.00 <br />$7,000.00 <br />Entrance signs Each 1 $5,000.00 $5,000.00 <br />Design/Engineering $1,000.00 <br />Construction Contingency $1,000.00 <br />GaGa Ball Pit $2,450.00 <br />Materials Each 1 $1,750.00 $1,750.00 <br />Design/Engineering 20%$350.00 <br />Construction Contingency 20%$350.00 <br />$21,420.00 <br />Trail construction to playground and bathroom (8' Wide)Lin Ft 150 $34.00 $5,100.00 <br />Establish trail connection at Arden Oaks Ct.Lin Ft 300 $34.00 $10,200.00 <br />Design/Engineering/Consulting $3,060.00 <br />Construction Contingency $3,060.00 <br />$2,380.00 <br />Trail construction - 8' Wide Bituminous Lin Ft 50 $34.00 $1,700.00 <br />20% <br />20% <br />20% <br />Dog Waste Stations <br />20% <br />20% <br />Accessible Trail Construction <br />Basketball Hoops <br />Accessible route to picnic shelter <br />20% <br />20% <br />Bicycle Parking <br />20% <br />20% <br />Park Entrance Sign <br />20% <br />20% <br />Restroom <br />20% <br />20% <br />Benches <br />20% <br />Picnic Table <br />20% <br />20% <br />20% <br />Trash receptacles <br />20% <br />Page 2 of 3