Laserfiche WebLink
Freeway Park I Arden Hills, MN <br />Attachment E <br />Preliminary Cost Estimate <br />Identified Improvements <br />Unit <br />Qty <br />Unit Cost <br />Estimated Cost <br />Accesible Trail Construction <br />$40,796.00 <br />Trail Construction - Bituminous (8' Wide) (connect upper and lower section of park) <br />Lin Ft <br />460 <br />$34.00 <br />$15,640.00 <br />Grading <br />Lump Sum <br />1 <br />$5,000.00 <br />$5,000.00 <br />Clearing + Grubbing Trees <br />Each <br />5 <br />$1,500.00 <br />$7,500.00 <br />Electric Utility Power Pole Relocation <br />Lump Sum <br />1 <br />$1,000.00 <br />$1,000.00 <br />Design/Engineering <br />20% <br />$5,828.00 <br />Construction Contingency <br />20% <br />$5,828.00 <br />Parking Lot <br />$67,900.00 <br />Pave Gravel Parking Lot (+/-) 6 Stalls (Bituminous + Aggregate Base) <br />Scl Ft <br />1900 <br />$25.00 <br />$47,500.00 <br />Parking Lot Striping (Including ADA Stall + Access Aisle) <br />Lin Ft <br />200 <br />$5.00 <br />$1,000.00 <br />Design/Engineering/Consulting <br />20% <br />$9,700.00 <br />Construction Contingency <br />20% <br />$9,700.00 <br />Tree Removals <br />$21,000.00 <br />Tree Removals <br />Day <br />2 <br />$5,000.00 <br />$10,000.00 <br />Stump Removals <br />Day <br />1 <br />$5,000.00 <br />$5,000.00 <br />Design/Engineering/Consulting <br />20% <br />$3,000.00 <br />Construction Contingency <br />20% <br />$3,000.00 <br />Tree Trimming <br />$6,300.00 <br />Tree Trimming - 1 day <br />Each <br />1 <br />$4,500.00 <br />$4,500.00 <br />Design/Engineering/Consulting <br />20% <br />$900.00 <br />Construction Contingency <br />20% <br />$900.00 <br />Playground Replacement <br />$181,300.00 <br />Remove Existing Playground <br />Lump Sum <br />1 <br />$3,000.00 <br />$3,000.00 <br />Playground Equipment <br />Lump Sum <br />1 <br />$85,000.00 <br />$85,000.00 <br />Playground Installation <br />Lump Sum <br />1 <br />$34,000.00 <br />$34,000.00 <br />Concrete Play Area Perimeter - Plastic <br />Lin Ft <br />250 <br />$10.00 <br />$2,500.00 <br />Playground Surfacing - Wood Fiber <br />cubic yds <br />100 <br />$50.00 <br />$5,000.00 <br />Alternate Surfacing: Poured -In -Place Rubber <br />Scl Ft <br />3300 <br />$25.00 <br />$82,500.00 <br />Design/Engineering <br />20% <br />$25,900.00 <br />Construction Contingency <br />20% <br />$25,900.00 <br />Playground Replacement - Upgraded concrete perimeter <br />$205,660.00 <br />Remove Existing Playground <br />Lump Sum <br />1 <br />$3,000.00 <br />$3,000.00 <br />Playground Equipment <br />Lump Sum <br />1 <br />$85,000.00 <br />$85,000.00 <br />Playground Installation <br />Lump Sum <br />1 <br />$34,000.00 <br />$34,000.00 <br />Concrete Play Area Perimeter Curb (8" Wide) <br />Lin Ft <br />250 <br />$40.00 <br />$10,000.00 <br />Site Grading <br />Scl Ft <br />3300 <br />$3.00 <br />$9,900.00 <br />Playground Surfacing - Wood Fiber <br />cubic yds <br />100 <br />$50.00 <br />$5,000.00 <br />Alternate Surfacing: Poured -In -Place Rubber <br />Scl Ft <br />3300 <br />$25.00 <br />$82,500.00 <br />Design/Engineering <br />20% <br />$29,380.00 <br />Construction Contingency <br />20% <br />$29,380.00 <br />Playground Replacement - Upgraded Amenities <br />$314,060.00 <br />Remove Existing Playground <br />Lump Sum <br />1 <br />$3,000.00 <br />$3,000.00 <br />Playground equipment <br />Lump Sum <br />1 <br />$125,000.00 <br />$125,000.00 <br />Playground Installation <br />Lump Sum <br />1 <br />$50,000.00 <br />$50,000.00 <br />Concrete Play Area Perimeter Curb (8" Wide) <br />Lin Ft <br />250 <br />$40.00 <br />$10,000.00 <br />Site Grading <br />Scl Ft <br />3300 <br />$3.00 <br />$9,900.00 <br />Playground Surfacing - Wood Fiber <br />cubic yds <br />100 <br />$50.00 <br />$5,000.00 <br />Alternate Surfacing: Poured -In -Place Rubber <br />Sq Ft <br />3300 <br />$25.00 <br />$82,500.00 <br />Design/Engineering <br />20% <br />$57,080.00 <br />Page 1 of 3 <br />