Freeway Park | Arden Hills, MN Preliminary Cost Estimate <br />Construction Contingency $57,080.00 <br />$157,808.00 <br />Removal of Existing Boards Lump Sum 1 $1,000.00 $1,000.00 <br />Rink Boards (150'x75') & Installation Lump Sum 1 $93,000.00 $93,000.00 <br />Concrete Dasher Board Strip (15" Wide x 6" Depth)Lin Ft 416 $45.00 $18,720.00 <br />Design/Engineering/Consulting $22,544.00 <br />Construction Contingency $22,544.00 <br />$174,608.00 <br />Removal of Existing Boards Lump Sum 1 $1,000.00 $1,000.00 <br />Rink Boards (150'x75') & Installation Lump Sum 1 $105,000.00 $105,000.00 <br />Concrete Dasher Board Strip (15" Wide x 6" Depth)Lin Ft 416 $45.00 $18,720.00 <br />Design/Engineering/Consulting $24,944.00 <br />Construction Contingency $24,944.00 <br />$223,608.00 <br />Removal of Existing Boards Lump Sum 1 $1,000.00 $1,000.00 <br />Rink Boards (150'x75') & Installation Lump Sum 1 $140,000.00 $140,000.00 <br />Concrete Dasher Board Strip (15" Wide x 6" Depth)Lin Ft 416 $45.00 $18,720.00 <br />Design/Engineering/Consulting $31,944.00 <br />Construction Contingency $31,944.00 <br />$300,580.00 <br />6" Reinforced Concrete Slab w/ Thickened Edge for Dasher Board Mounting Lump Sum 1 $200,000.00 $200,000.00 <br />Draintile Lin Ft 420 $35.00 $14,700.00 <br />Design/Engineering/Consulting $42,940.00 <br />Construction Contingency $42,940.00 <br />$7,700.00 <br />Basketball Hoops Each 1 $5,000.00 $5,000.00 <br />Installation Each 1 $500.00 $500.00 <br />Design/Engineering/Consulting $1,100.00 <br />Construction Contingency $1,100.00 <br />$17,808.00 <br />Mill + Overlay of basketball court Sq. Yd.212 $32.00 $6,784.00 <br />Acyrlic Painting Sq. Yd.212 $28.00 $5,936.00 <br />Design/Engineering $2,544.00 <br />Construction Contingency $2,544.00 <br />$105,000.00 <br />New LED Lighting (lights, poles, new electrical, app controlled)Each 4 $18,750.00 $75,000.00 <br />Design/Engineering/Consulting $15,000.00 <br />Construction Contingency $15,000.00 <br />$250,000-$1,000,000 <br />Building Replacement Lump Sum 1 $250,000-$1,000,000 $250,000-$1,000,000 <br />Design/Engineering - <br />Construction Contingency - <br />$70,000.00 <br />Building Repairs Lump Sum 1 $50,000.00 $50,000.00 <br />Design/Engineering $10,000.00 <br />Construction Contingency $10,000.00 <br />$4,648.00 <br />Bicycle Parking Each 4 $500.00 $2,000.00 <br />Concrete Pad (4" Thick)Sq Ft 110 $12.00 $1,320.00 <br />Design/Engineering $664.00 <br />Construction Contingency $664.00 <br />$3,091.20 <br />20% <br />20% <br />Basketball Hoops <br />20% <br />20% <br />20% <br />Rink - Wood Dasher Boards <br />Rink - Aluminum Dasher Boards <br />20% <br />20% <br />Building Repairs <br />20% <br />20% <br />Portable Toilet <br />20% <br />Building Replacement <br />LED Rink Lighting <br />20% <br />20% <br />Rink - Fiberglass Dasher Boards <br />20% <br />20% <br />Concrete Hockey Rink Slab <br />20% <br />20% <br />20% <br />20% <br />20% <br />Bicycle Parking <br />Basketball Court Resurfacing <br />20% <br />20% <br />Page 2 of 3