Laserfiche WebLink
Freeway Park I Arden Hills, MN <br />Preliminary Cost Estimate <br />Construction Contingency <br />20% <br />$57,080.00 <br />Rink - Wood Dasher Boards <br />$157,808.00 <br />Removal of Existing Boards <br />Lump Sum <br />1 <br />$1,000.00 <br />$1,000.00 <br />Rink Boards (150'x75') & Installation <br />Lump Sum <br />1 <br />$93,000.00 <br />$93,000.00 <br />Concrete Dasher Board Strip (15" Wide x 6" Depth) <br />Lin Ft <br />416 <br />$45.00 <br />$18,720.00 <br />Design/Engineering/Consulting <br />20% <br />$22,544.00 <br />Construction Contingency <br />20% <br />$22,544.00 <br />Rink - Aluminum Dasher Boards <br />$174,608.00 <br />Removal of Existing Boards <br />Lump Sum <br />1 <br />$1,000.00 <br />$1,000.00 <br />Rink Boards (150'x75') & Installation <br />Lump Sum <br />1 <br />$105,000.00 <br />$105,000.00 <br />Concrete Dasher Board Strip (15" Wide x 6" Depth) <br />Lin Ft <br />416 <br />$45.00 <br />$18,720.00 <br />Design/Engineering/Consulting <br />20% <br />$24,944.00 <br />Construction Contingency <br />20% <br />$24,944.00 <br />Rink - Fiberglass Dasher Boards <br />$223,608.00 <br />Removal of Existing Boards <br />Lump Sum <br />1 <br />$1,000.00 <br />$1,000.00 <br />Rink Boards (150'x75') & Installation <br />Lump Sum <br />1 <br />$140,000.00 <br />$140,000.00 <br />Concrete Dasher Board Strip (15" Wide x 6" Depth) <br />Lin Ft <br />416 <br />$45.00 <br />$18,720.00 <br />Design/Engineering/Consulting <br />20% <br />$31,944.00 <br />Construction Contingency <br />20% <br />$31,944.00 <br />Concrete Hockey Rink Slab <br />$300,580.00 <br />6" Reinforced Concrete Slab w/ Thickened Edge for Dasher Board Mounting <br />Lump Sum <br />1 <br />$200,000.00 <br />$200,000.00 <br />Draintile <br />Lin Ft <br />420 <br />$35.00 <br />$14,700.00 <br />Design/Engineering/Consulting <br />20% <br />$42,940.00 <br />Construction Contingency <br />20% <br />$42,940.00 <br />Basketball Hoops <br />$7,700.00 <br />Basketball Hoops <br />Each <br />1 <br />$5,000.00 <br />$5,000.00 <br />Installation <br />Each <br />1 <br />$500.00 <br />$500.00 <br />Design/Engineering/Consulting <br />20% <br />$1,100.00 <br />Construction Contingency <br />20% <br />$1,100.00 <br />Basketball Court Resurfacing <br />$17,808.00 <br />Mill + Overlay of basketball court <br />Sq. Yd. <br />212 <br />$32.00 <br />$6,784.00 <br />Acyrlic Painting <br />Sq. Yd. <br />212 <br />$28.00 <br />$5,936.00 <br />Design/Engineering <br />20% <br />$2,544.00 <br />Construction Contingency <br />20% <br />$2,544.00 <br />LED Rink Lighting <br />$105,000.00 <br />New LED Lighting (lights, poles, new electrical, app controlled) <br />Each <br />4 <br />$18,750.00 <br />$75,000.00 <br />Design/Engineering/Consulting <br />20% <br />$15,000.00 <br />Construction Contingency <br />20% <br />$15,000.00 <br />Building Replacement <br />$250,000-$1,000,000 <br />Building Replacement <br />Lump Sum <br />1 <br />$250,000-$1,000,000 <br />$250,000-$1,000,000 <br />Design/Engineering <br />20% <br />Construction Contingency <br />20% <br />Building Repairs <br />$70,000.00 <br />Building Repairs <br />Lump Sum <br />1 <br />$50,000.00 <br />$50,000.00 <br />Design/Engineering <br />20% <br />$10,000.00 <br />Construction Contingency <br />20% <br />$10,000.00 <br />Bicycle Parking <br />$4,648.00 <br />Bicycle Parking <br />Each <br />4 <br />$500.00 <br />$2,000.00 <br />Concrete Pad (4" Thick) <br />Sq Ft <br />110 <br />$12.00 <br />$1,320.00 <br />Design/Engineering <br />20% <br />$664.00 <br />Construction Contingency <br />20% <br />$664.00 <br />Portable Toilet <br />$3,091.20 <br />Page 2 of 3 <br />