Laserfiche WebLink
Freeway Park I Arden Hills, MN <br />Preliminary Cost Estimate <br />Concrete Pad <br />Scl Ft <br />64 <br />$12.00 <br />$768.00 <br />Screen Fence - Wood/Metal <br />Lin Ft <br />24 <br />$60.00 <br />$1,440.00 <br />Design/Engineering <br />20% <br />$441.60 <br />Construction Contingency <br />20% <br />$441.60 <br />Benches <br />$10,640.00 <br />Bench <br />Each <br />4 <br />$1,500.00 <br />$6,000.00 <br />Concrete Pad (-32 SF) <br />Each <br />4 <br />$400.00 <br />$1,600.00 <br />Design/Engineering <br />20% <br />$1,520.00 <br />Construction Contingency <br />20% <br />$1,520.00 <br />Picnic Tables <br />$5,880.00 <br />Picnic Table <br />Each <br />2 <br />$1,200.00 <br />$2,400.00 <br />Concrete Pad (-84 SF) <br />Each <br />2 <br />$900.00 <br />$1,800.00 <br />Design/Engineering <br />20% <br />$840.00 <br />Construction Contingency <br />20% <br />$840.00 <br />Trash Receptacles <br />$3,628.80 <br />Trash Receptacles <br />Each <br />3 <br />$800.00 <br />$2,400.00 <br />Concrete Pad (4" Thick) <br />Scl Ft 16 $12.00 <br />$192.00 <br />Design/Engineering <br />20% <br />$518.40 <br />Construction Contingency <br />20% <br />$518.40 <br />Dog Waste Stations <br />$1,400.00 <br />Dog Waste Stations <br />Each <br />2 <br />$500.00 <br />$1,000.00 <br />Design/Engineering <br />20% <br />$200.00 <br />Construction Contingency <br />20% <br />$200.00 <br />Park Entrance Sign <br />$7 000.00 <br />Entrance Sign (City Standard Design) <br />Each <br />1 <br />$5,000.00 <br />$5,000.00 <br />Design/Engineering <br />20% <br />$1,000.00 <br />Construction Contingency <br />20% <br />$1,000.00 <br />GaGa Ball Pit $2,450.00 <br />Materials <br />Each <br />1 <br />$1,750.00 <br />$1,750.00 <br />Design/Engineering <br />20% <br />$350.00 <br />Construction Contingency <br />20% <br />$350.00 <br />Page 3 of 3 <br />