Laserfiche WebLink
Freeway Park | Arden Hills, MN Preliminary Cost Estimate <br />Concrete Pad Sq Ft 64 $12.00 $768.00 <br />Screen Fence - Wood/Metal Lin Ft 24 $60.00 $1,440.00 <br />Design/Engineering $441.60 <br />Construction Contingency $441.60 <br />$10,640.00 <br />Bench Each 4 $1,500.00 $6,000.00 <br />Concrete Pad (~32 SF)Each 4 $400.00 $1,600.00 <br />Design/Engineering $1,520.00 <br />Construction Contingency $1,520.00 <br />$5,880.00 <br />Picnic Table Each 2 $1,200.00 $2,400.00 <br />Concrete Pad (~84 SF)Each 2 $900.00 $1,800.00 <br />Design/Engineering $840.00 <br />Construction Contingency $840.00 <br />$3,628.80 <br />Trash Receptacles Each 3 $800.00 $2,400.00 <br />Concrete Pad (4" Thick)Sq Ft 16 $12.00 $192.00 <br />Design/Engineering $518.40 <br />Construction Contingency $518.40 <br />$1,400.00 <br />Dog Waste Stations Each 2 $500.00 $1,000.00 <br />Design/Engineering $200.00 <br />Construction Contingency $200.00 <br />$7,000.00 <br />Entrance Sign (City Standard Design)Each 1 $5,000.00 $5,000.00 <br />Design/Engineering $1,000.00 <br />Construction Contingency $1,000.00 <br />GaGa Ball Pit $2,450.00 <br />Materials Each 1 $1,750.00 $1,750.00 <br />Design/Engineering 20%$350.00 <br />Construction Contingency 20%$350.00 <br />20% <br />Dog Waste Stations <br />20% <br />Trash Receptacles <br />20% <br />20% <br />20% <br />20% <br />20% <br />Benches <br />20% <br />Picnic Tables <br />20% <br />20% <br />Park Entrance Sign <br />20% <br />20% <br />Page 3 of 3