My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
07-22-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 2:03:26 PM
Creation date
7/19/2024 9:44:36 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Standards <br />"the arrangement, massing, materials and colors shall work to <br />create a high quality development that is responsive to <br />existing buildings, site features, and site design on adjoining <br />sites in the district" <br />R�rdsrrnF ai .: -ess •rs <r. crz' 5e�:�: %'�•.:.::ic:_s <br />• Applicant states facility design has facade stepping and a variation in rooflines as viewed from all elevations and will <br />incorporate many "Green Building" sustainable design features. <br />• This project is intended to meet their needs for "the next 50 years" and will provide for the administrative, <br />operational, apparatus bays, and training facility. <br />• Facility will be used for classroom and hands-on training both inside the training room and outside. Groups ranging <br />from 10-40 firefighters in attendance a few times each week. <br />• A 4 story training tower on the west (rear) side of the building will use non -toxic fire props, theatrical smoke machines <br />and will also be used for ladder training and rope rescue training. <br />• As part of their design process in 2020/21, the Applicant shared schematic "artist's views" of their project plans and <br />renderings with each City Council for feedback. <br />• This information was used as part of their due diligence prior to preparation of their project bid documents which <br />have been finalized. <br />-IDENN HILLS <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.