Laserfiche WebLink
ARDEN HILLS PLANNING COMMISSION — July 10, 2024 13 <br />but not limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey County <br />(i.e. ROW or access) prior to the start of any site activities. <br />6) The final plans shall be subject to approval by the City Engineer, Building Official, and <br />Fire Marshal prior to the issuance of a grading and erosion control permit. <br />7) Final grading, drainage, utility, and site plans shall be subject to approval by the Public <br />Works Director, City Engineer, and Community Development Director prior to the <br />issuance of a grading and erosion control permit or other development permits. <br />8) Upon completion of grading and utility work on the site, a grading as -built and utility as - <br />built shall be provided to the City for review. <br />9) Heavy duty silt fence and adequate erosion control around the entire construction site shall <br />be required and maintained by the Developer during construction to ensure that sediment <br />and storm water does not leave the project site. <br />10) The Applicant shall be responsible for protecting the proposed on -site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />11) All light poles, including base, shall be a maximum of 25 feet in height and shall be <br />shoebox style, downward directed, with high-pressure sodium lamps or LED and flush <br />lenses. <br />12) All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br />same materials used on the building in accordance with City Code requirements. <br />13) A separate sign permit shall be required for all signs on the site. <br />14) Any future trash and vacuum enclosures shall utilize gates and be constructed on three <br />sides using the same materials and patterns used on the building. Locations shall be <br />approved by the Planning Department. <br />15) The Applicant shall be financially responsible for all applicable water and sanitary <br />charges. Rates applied shall be memorialized in the Development Agreement. <br />16) All disturbed boulevards shall be restored with sod. All areas of the site, where practical, <br />shall be sodded or seeded and maintained. The property owner shall mow and maintain <br />all site boulevards to the curb line of the public streets. <br />17) The proposed structure shall conform to all other regulations in the City Code. <br />2. Recommend Approval as Submitted <br />3. Recommend Denial <br />4. Table <br />Chair Weber opened the public hearing at 9:13 p.m. <br />Chair Weber invited anyone for or against the application to come forward and make comment. <br />There being no comment Chair Weber closed the public hearing at 9:13 p.m. <br />Chair Weber asked if there would be a full depth replacement of the parking lot. <br />Senior Planner Fransen deferred this question to the applicant. <br />