Laserfiche WebLink
<br />4 <br /> <br />Softball in-field grading and maintenance work to be completed spring timeframe by FTE’s. Field <br />lighting, fencing, dugouts, bases, base boxes, trash/recycling receptacles and field signage will be <br />inspected and repaired as needed. Ongoing maintenance, field preparation prior to practices and games <br />is completed by SPT Staff. The park location and number of fields is listed below. <br />• Cummings Park (1 field) <br />• Royal Park (1 field) <br />• Floral Park (1 field) <br />o Evaluate for outfield drain tile installation in 2025. Discharge collected water into the <br />2024 PMP surface water improvements. <br />• Perry Park (3 fields) <br />• Hazelnut Park (1 field) <br />Athletic field striping and setup is completed for soccer and soft ball fields and is completed at the <br />following parks throughout the spring, summer, and fall. This includes the initial field layout and soccer <br />goal setup completed by FTE’s. <br />• Royal Park (foul lines) <br />• Cummings Park (foul lines, 2 adult soccer fields, 1 youth soccer field) <br />• Floral Park (foul lines) <br />• Perry Parks foul lines, 3 fields) <br />• Hazelnut Park (foul lines, 2 adult soccer fields) <br />• Valentine Hills Elementary running track <br /> <br />Lake Shore Place ROW shrub replacement <br />