Laserfiche WebLink
<br />9 <br /> <br />Hockey board preventative maintenance will include pressure washing and sealing the boards with a <br />clear sealer at Hazelnut Park. This project can be completed by volunteers with the assistance of FTE’s. <br />The Hazelnut Park hockey rink is highlighted below. <br /> <br />Play structure wood fiber/mulch maintenance will be completed based on the spring playground <br />inspection measurements of mulch depth. Monthly play structure inspections are completed during the <br />spring, summer, and fall months. During inspections, damaged or vandalized equipment will be replaced <br />and the structure is checked for overall safety. Arden Oaks and Freeway Parks will have mulch replaced <br />as part of the improvement project in 2025. <br />A full replacement of the play structure fiber mulch is scheduled for every 10 years as a guideline. <br />Valentine Park and Royal Hills Park are proposed for this year. <br />The map below outlines all play structures citywide. <br />