Laserfiche WebLink
<br />10 <br /> <br />Park Building maintenance – monthly inspections, and project details below. <br />• Cummings Pavilion <br />o Full replacement of the south furnace. (The north furnace was replaced February 2024) <br />o Pressure wash concrete patio, sidewalks, picnic tables, and exterior of the building. <br />o Replace furnace and water fountain filters. <br />o Contract to clean HVAC duct system. <br />o Sanitize and deodorize interior rubber flooring. <br />• Perry Pavilion <br />o Pressure wash concrete patio/ sidewalks, picnic tables, and exterior of the building. <br />o Replace the men restroom door and frame. <br />o Full roof replacement will be scheduled in spring of 2024. <br />o Paint walls in the restrooms and kitchen. <br />o Open the building and turn on plumbing in the spring. Winterize plumbing in the fall. <br />• Perry Warming House <br />o Inspect roof. <br />o Sanitize and deodorize interior rubber flooring. <br />• Freeway Warming House <br />o Roof inspection <br />o Pressure wash exterior. Spot replacement of the siding, soffits, fascia and paint exterior. <br />o Sanitize and deodorize interior rubber flooring. <br />• Floral Park Ball Field Drain Tile <br />o A plan for installation, including budget amount to be added to the 2025 budget. <br />Hard Court maintenance at each location below- <br />• Cummings Park, double tennis court and attached basketball court. <br />o Install tennis nets, remove debris, crack fill courts (contractor). <br />• Arden Manor Park, basketball court <br />o Reconstruction potentially in 2024 <br />• Royal Park, tennis and basketball court <br />o Install tennis nets, remove debris, crack fill (contractor). <br />• Floral Park, tennis and basketball court <br />o Reconstructed in 2023, play surface striping to be installed 2024 by contractor. <br />• Hazelnut Park, tennis and basketball court <br />o Install tennis nets, remove debris <br />o Scheduled for 2025 pavement rehabilitation <br />• Arden Oaks, basketball court <br />o Install tennis nets, remove debris, crack fill (contractor). <br />o Scheduled for 2025 pavement rehabilitation <br />• Freeway Park, basketball court <br />o Scheduled for pavement rehabilitation in 2025. <br />• Ingerson Park, basketball court <br />o Pressure wash and crack fill court (contractor)