My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
09-09-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 11:13:01 AM
Creation date
9/9/2024 10:58:04 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION — AUGUST 19, 2024 6 <br />updated from $415,000 to $475,000, an increase of $60,000. The 2027 figure increased from <br />$580,000 to $695,000, an increase of $115,000. <br />Councilmember Holden asked if the sewer lining needed to be increased. There is no grant <br />money for 2025. <br />Public Works Director/City Engineer Swearingen stated the public improvements for that <br />grant opportunity go through 2025. <br />Councilmember Holden asked for clarification if the bid would be increased by $60,000. <br />Public Works Director/City Engineer Swearingen stated he increased that number by $60,000 <br />based off the pricing he received this year for material cost. He adjusted it based off what the <br />market is right now. <br />Councilmember Holden thought the number was lower when we put the bid out. <br />Public Works Director/City Engineer Swearingen stated he's doing more lining. This is the <br />Glenarden Neighborhood. There is more 10-inch pipe then there was in the last one. It could still <br />change; he was being conservative. <br />Councilmember Holden clarified, even if we don't get grant money from Met Council, Public <br />Works Director/City Engineer David Swearingen will still want to spend this money. <br />Public Works Director/City Engineer Swearingen confirmed. He is proposing the project as it <br />is right now. He can be flexible, if necessary. <br />Councilmember Holden asked if a request for I/I money has been made for 2025. <br />Public Works Director/City Engineer Swearingen stated he put us in the program last year and <br />that will be reimbursed in January of 2026. <br />Councilmember Holden asked how much of the $475,000 would be reimbursed. <br />Public Works Director/City Engineer Swearingen answered it would be roughly 25%. When <br />he applied, he put in everything in the CIP he had planned for during that timeframe. He can <br />monitor it and see how the funding is going before he puts it out for bid. <br />Councilmember Holden asked if that was the only project for Glenarden. <br />Public Works Director/City Engineer Swearingen confirmed that is the only lining project in <br />2025. There might be some minimal lining in 2026 with the PMP but it's a new neighborhood. <br />Mayor Grant assumed this project could be pushed. He said lining projects are one after another. <br />Public Works Director/City Engineer Swearingen would get authorization from Council <br />before he went out for bid on a project like this. <br />Mayor Grant asked if the approach is still to do the worst first. He asked if we are caught up. <br />
The URL can be used to link to this page
Your browser does not support the video tag.