Anticipated project schedule: <br />• April 2024: Project Kickoff and Online Survey Development (Completed) <br />• April/May 2024: Perform and Complete Public Involvement Process (Completed) <br />• May 2024: Finalize Online Survey Report (Completed) <br />• May 28, 2024: Present Final Report findings at Work Session to Council (Completed) <br />• June 10, 2024: Council defined project job (Completed) <br />• June 2024: Take selected Scope of Work and Amend PSA for Design and Construction <br />• July/August 2024: Concept design with updated cost estimates, host Open -House event <br />• Au ug st/September 2024: PTRC and City Council involvement and prelim cost estimates <br />• Fall 2024: Lock -in purchase of play equipment <br />• Winter 2024/2025: Final design and cost estimates <br />• February/March 2025: Bid <br />• April 2025: Award construction contract <br />• Summer/Fall 2025: Construction <br />Since the last Work Session on June loth, the project had its Open House at City Hall on <br />Thursday, August 8th, there were approximately 30 people that attended. Also, there was an <br />additional online survey which was advertised to resident users through the month of August. <br />The results of the open house and online survey are combined and summarized within the memo <br />from BMI in Attachment A. <br />At the PTRC meeting on August 20th, the PTRC reviewed the available survey results from both <br />the open house and the online survey. The PTRC recommended that Council move to follow the <br />majority recommendation of the park users from the surveys for both the play structure types and <br />the play structure colors. PTRC also added a comment stating that they would recommend that a <br />shade structure also be added to the project scope at Arden Oaks Park. <br />Discussion <br />Council should consider the survey results for both parks, the PTRC recommendations and select <br />the final play structures and colors from the playground vendor. There are potential needs for <br />ADA Access with updated play structures to align with Arden Hills' overall general practices <br />and requirements from the U.S. Access Board's Standard Practice which will be discussed <br />further during the meeting for this item. If given direction, staff will move forward with ordering <br />the structures and bring that item back to Council at a regular meeting for formal approval. <br />The next steps of this project will be reviewing options for the landscaping or fencing barrier at <br />Freeway Park along the on -ramp to Highway 51 and any input on final design and layout of site <br />amenities. <br />Budget Impact <br />The 2025 Park Improvement Project, as programmed in the 2024-2028 CIP, is budgeted for the <br />replacement of the play structures, rehabilitation of the hardcourts and some miscellaneous items <br />that relate to the play structure or hardcourts or items that have been consistent in recent past <br />Park Improvement Projects. <br />Page 2 of 4 <br />