Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />11 <br /> <br />. <br /> <br />during the 20 year period and save the interest during that <br /> <br />period of time. <br /> <br />~e have this one item that corner lots and odd shaped lots <br />will be given special consideration. That's because if you ~ave <br />a corner lot there's one way of approaching it and if they're pie <br /> <br />shaped lots special consideration is given as far as area and how <br /> <br /> <br />you tie in with the rest of the people in that whole block. ~,'hat <br /> <br />we're trying to do is have equality between like people in a li~e <br /> <br />area having like homes and like area in their lots. Une additional <br /> <br />cost is for the total cost - add an estimated connection of S2CC <br /> <br />which is paid individually or directly to your individual contractor. <br /> <br />This is the cost you pay once to ccnnect from the street :0 ycur <br /> <br />. <br /> <br />house. The village does not hook up from the street to your heme. <br /> <br />This is your private business with your ;::lumber. Cf course, <br /> <br /> <br />dependent en how far back your house is located, ~hether your septic <br /> <br />tanK or drain field is in the front or back of the home - whether <br /> <br />you have certain plumbing, this cost may vary. It's frankly an <br /> <br /> <br />estimated cost. V;e have seen it below this and higher depending <br /> <br />0n individual circumstances. It's a cost that you poy once after <br /> <br />the system is there. 50 in order to bring this to a more concrete <br /> <br />exaMple, 'Ne have taken a home on today's market that WOUld sell for <br /> <br />about $2G,OOC in Arden Hills, which is reflective of this area, <br /> <br />located on an 80 foot lot which is a typical lot in Arden Hills. <br /> <br />,:,0 locking at it on this basis, we start with No. 1. The <br /> <br />specia I assessment would then be 8e feet times $Ie. ~c because they <br /> <br />. would heve imr.ediate service and pay SIC.CIC. That "auld be <br />:~8CC'.CJ fer the assessment. No.:2, the connection charge is this <br /> <br />22r~.-r that you pay cash to your plumber. It's not included in <br />