Laserfiche WebLink
ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION— SEPTEMBER 9, 2024 3 <br /> Public Works Director and City Engineer Swearingen wanted to add that the budget for the <br /> hard-court rehabs is probably over-budgeted. Any overage in that budget could be allocated <br /> towards the structures. <br /> Councilmember Monson clarified that additional budget funds for Freeway Park, could be <br /> allocated to Arden Hills Park. Public Works Director and City Engineer Swearingen <br /> confirmed. <br /> Councilmember Holden thought that Option 1 was quoted from St. Croix and that MWP would <br /> probably have something very similar. <br /> Bryce Shearen stated they may have something similar, but not in the budget that was specified. <br /> The vendors were given the budget, and these were the options we received. <br /> Mayor Grant asked if there were any concerns if we chose a different vendor for the two parks. <br /> Bryce Shearen said he doesn't have any concern about using two vendors but would defer to <br /> staff about what they were comfortable with. <br /> Public Works Director and City Engineer Swearingen said Public Works is comfortable with <br /> it. <br /> Councilmember Holden said typically if a slide or other equipment breaks, there's one on hand <br /> because the same equipment was used throughout the parks. She asked if that will be an issue. <br /> Public Works Director and City Engineer Swearingen is not worried about that. He said <br /> having two different contacts to deal with is not a concern. <br /> Councilmember Monson remembered discussion at the open house that one of the parks be a <br /> traditional playground and the other be a nature-based playground. She is curious if that is an <br /> option. <br /> Bryce Shearen said he talked to the vendors after that meeting and they both said that is an <br /> option. They can design whatever we want. That would mean taking a step back and letting <br /> residents vote on that type of equipment. He has not requested proposals from the vendors, but he <br /> can do that, if Council wishes. <br /> Councilmember Monson wondered if he had a price range for what a nature-based playground <br /> would cost, or what $150,000 could buy. <br /> Bryce Shearen said those are custom playgrounds. He would anticipate there would be fewer <br /> features in that type of play structure. <br /> Councilmember Monson wondered what Council appetite would be for moving forward with <br /> Freeway Park this year because that falls into the budget. Then hold off on Arden Oaks to see <br /> what a nature-based playground could look like. Then the projects would be staggered. <br />